Laserfiche WebLink
<br />NOTE: IMPERVIOUS SURFACES SHALL BE <br />SLOPED A MINIMUM 2% AWAY FROM <br />PROPOSED BUILDING PER CRC SECTION R401.3 <br />NOTES: <br />1) ALL CONSTRUCTION SHALL COMPLY WITH CBC REQUIREMENTS TYPICAL 2) CONTRACTOR SHALL LOCATE AND VERIFY ALL UTILITIES <br />AND SETBACKS AT JOB SITE PRIOR TO CONSTRUCTION. 3) SLOPE ALL FINISH GRADES AWAY FROM STRUCTURE AT <br />5% FOR A MINIMUM OF 10 OR TO SWALE TO PROVIDE POSITIVE DRAINAGE 4) LOCATE ALL UTILITIES AT JOB SITE PRIOR TO CONSTRUCTION <br />PROPERTY LINE <br />TYPICAL <br />