Laserfiche WebLink
i <br /> SPECIAL NOTES: <br /> 1. The contractor shall coordinate all the work and the necessary <br /> information and materials, accessories, anchors, connections, patterns, <br /> templates, etc.. That shall be delivered when required in order top revent <br /> any delay in the progress and completion of work. Coordinates between all <br /> the trades is of essence. <br /> 2. The Contractor shall visit the job site and examine the existing conditions. The <br /> contractor on signing the agreement, warrants that he has visited the site and <br /> familiarize himself with all conditions there on. No extra payment will be <br /> x given for conditions which can be determine by a thorough examination <br /> of the site and documents. <br /> 3. The contractor shall not make any alterations to the drawings. In all cases, whe <br /> 4 <br /> there is a discrepancy in the quality of an Item, installation, details, <br /> workmanship or other construction techniques, the contractor shall use <br /> the better quality Item, installation or construction techniques provide to <br /> produce theobest available cost or work required. In any event, a f+. <br /> discrepancy within the drawing should immediately be brought to the t" <br /> attention of the architect for a decision before proceeding with <br /> the particular work involved. Work carried out disregarding these ' <br /> instruction is subject to removal and replacement at the expenses of r <br /> G <br /> the contractor. <br /> 4. In all cases, figured dimension take precedence over scaled measurements. <br /> No dimension shall at any time be determined by scale. <br /> 5. The contractor is to layout and be responsible for the correctness ` <br /> of laying out space improvement and for locating services and utilities. <br /> 6. The contractor shall install / apply all materials in strict compliance with <br /> the manufacturer's instructions. <br /> 7. The contractor shall clean up and removed any trash, dirt, debris and <br /> spillage arising from the work to the satisfaction of the owner and <br /> architect, including cleaning of dirt, putty, paint, etc... from work areas, <br /> and cleaning of windows faces and mullions. <br /> 8. Contractor to verify all dimensions and conditions before proceeding <br /> with work. <br /> po 9. Contractor is to repair any damage to existing condition to remain and to <br /> match existing at no expense to the owner. <br /> ✓I �� : 10.Contractor is to install all owner furnished equipment, including electrical, >F <br /> and plumbing connections as required. <br /> 11. All new lumber shall be TERMITE TREATED. j <br /> F <br /> BE <br /> SAN <br /> t <br /> q� ® —C �' ENVIRONMENTALHUtNCOUNTY FOR DETERMINING (��i`�� <br /> 7 L f'� EALTH DEPARTMENT � MAUI <br /> ,I� ;3 <br /> 304 E WEBER AVE THIRD FLOOR PROPERTY <br /> LINES AND EA,8 t <br /> �Y <br /> PROP SAL APPROV20 <br /> ED SUBJECT <br /> STOCKTON CA 95202 <br /> TO, <br /> P� OBTAIN SANITATION PERMIT !, <br /> ❑ OBTAIN WELUIPUMP PERMIT <br /> ❑ CONDITIONS NOTED BELOW 1810 E.Hazelton Ave <br /> Z 2Z R MARKS xtdd �o r�a��1 e Gu �a Proposed site plan approved 3,Sl <br /> a— f bue zaMs No changes or modificatic s n <br /> r n made without written approval <br /> Date 4.z-r a gym f this division. <br /> approval extends only to that which is shown and described Date q 4," gy <br /> hereon and does not authorize or approve any omission or <br /> -4.on from reouirements of state laws or local ordinances. e w 3`�r v 5 r rc Jc <br /> c oA v e, ex rf;7 a l <br /> 1 3 I <br /> __ r <br />