Laserfiche WebLink
a - <br /> a <br /> Farmisagton Groundwater Recharge Program STC Work Plan—Pettit Site <br /> recorded on the Groundwater Elevation collection forms (Appendix F) according to the schedule <br /> presented in Appendix D. <br /> Figure 4 Monitoring Well Construction Diagram <br /> STANDPIPE SURFACE <br /> COMPLETION <br /> WELL CASING COMPLETED <br /> 0.5'ABOVE GROUND SURFACE <br /> 0 <br /> q p ° <br /> 0 <br /> i d I d <br /> <P °y <br /> a a yq <br /> TYPE IIIIN PORTLAND CEMENT I a <br /> P. <br /> P •q' <br /> •e ' c <br /> BLANK CASING > <br /> 2.5"INNER DIAMETER q a <br /> 1 'P <br /> • a 40 <br /> •P <br /> , P <br /> p a <br /> n P I •qc <br /> a n > <br /> o , a <br /> a ° <br /> a <br /> n ' ? <br /> •Q I `p � <br /> i v • P <br /> a i a <br /> qP a Sa <br /> �•�q I p••6 <br /> TOP OF FINE SAND LAYER <br /> BOTTOM OF FINE SAND LAYER <br /> WELL SCREEN o ° - TOP OF SCREEN INTERVAL 80 <br /> 2.5"INNER DIAMETER " <br /> STATIC WATER LEVEL <br /> I <br /> FILTER PACK MATERIAL <br /> 100 <br /> SUMP: 1- BOTTOM OF SCREEN <br /> 2.5"INNER DIAMETER -- BOTTOM OF SUMP <br /> BOTTOM OF REAMED ROLE <br /> 8" <br /> i <br /> 120 <br /> i <br /> MWH 2-7 July 2004 <br /> f <br />