Laserfiche WebLink
f <br /> y� <br /> F <br /> FIGURE 3 <br /> j PROPOSED EXCAVATION <br /> AND SOIL SAMPLING PLAN <br /> PROJECT: CHEVRON\SO. EL DORADO <br /> LOCATION: 1374 SO. ELDORADO <br /> JOB NO.: 203-175-3289 <br /> r WASTE OIL TANK • PROPOSED PID <br /> A LOCATION SAMPLE LOCATION <br /> I I _ 1-1 <br /> A PROPOSED WELT.SOIL • EXPECTED LOCATION <br /> EXCAVATION <br /> STOCKPILE i !__ AREAS 0 FEET 25 <br /> I I iv7199 csr <br /> AREA � • • � <br /> ANTICIPATED t <br /> GROUNDWATI±R-- • • �j <br /> FLOW DIRECTION Li <br /> I I • • l a � <br /> o 0 <br /> 1 I <br /> I <br /> • � • I• PUMP ISLAND O <br /> i i 0 <br /> • • LOCATIONS I • • I <br /> AREA OF L-_---_- J <br /> EXPECTED EXCAVATION. a W <br /> WILL BE EXCAVATED <br /> AND SAMPLED <br /> AS REQUIRED V) <br /> BY MELD EVIDENCE <br /> CHARTER WAY <br /> CHEVRON USA <br /> STOCKTON CALIFORNIA <br />