My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BP0802727
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FUHRMAN
>
25875
>
4200/4300 - Liquid Waste/Water Well Permits
>
BP0802727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 10:30:22 PM
Creation date
12/5/2017 4:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
BP0802727
STREET_NUMBER
25875
Direction
N
STREET_NAME
FUHRMAN
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
02103058
Supplemental fields
FilePath
\MIGRATIONS\F\FUHRMAN\25875\BP0802727.PDF
QuestysFileName
BP0802727
QuestysRecordID
1777816
QuestysRecordType
12
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. All work shall comply with the California Building Code 7-S a <br /> Uniform Plumbing Code Uniform Mechanical Code, National <br /> Electric Code, and all applicable State County and <br /> Local Codes and Standards. <br /> &AA1 <br /> 2. Contractor shall familiarize himself with the actual site <br /> conditions prior to construction for any unique circumstances <br /> and/or discrepancies,that may exist. Contractor shall verify <br /> all dimensions called out on the plans, elevations sections <br /> etc. to determine potential discrepancies or conflicts prior to <br /> construction. <br /> 3. Contractor shall verify all dimensions, conditions, �a <br /> 7 <br /> specifications and details prior to the fabrication and start of t� 1� <br /> any work. Do not scale drawings. Only written dimensions <br /> are to be used. Unless reported contractor to be <br /> responsible for any dimensional inconsistencies and <br /> probable remedial work. , <br /> 4. In event that certain features of the construction are not <br /> shown, then their construction shall be of the some <br /> character as for similar conditions that are shown or called <br /> for. <br /> 5. The removal, cutting drilling, etc. of existing work shall be <br /> performed with great care and small tools in order not to <br /> jeopardize the structural integrity of the building. <br /> G. If structural members not indicatedinterl � �^ <br /> with the new work the designer and engineer (if v%plicab e)e� SAN HEALTH <br /> DE y � <br /> shall be immediatefy notified and proper approval obtained ENVIRONMENTAL HEALTH DEPARTMENT <br /> before the removal of members. 600 E.MAIN STREET <br /> STOCkTON,CA 95202 <br /> 7 The contactor is completely responsible for the conduct <br /> (209)468-3420 <br /> y <br /> Of the work including all construction methods PROeO�-�'ROVED.SUBJECT TOt C� <br /> site safety design and materials utilized for s, pr or duy es, L OBTAIN SANITATION PERMIT <br /> vertical and lateral support and bracing of the existing and C WELL/PUMP PERMIT <br /> new structure. CONDITIONS NOTED BELOW AG Building Elevation Abo <br /> /7-' �� "� Z I Not To Exceed 10 Inc <br /> 8. Contractor shall inform the designer of any and all 4 <br /> modifications to the drawings as requested and/or required �8 <br /> by inspector and/or any governing agency SPdate' y CL- <br /> I I i Grade <br /> IN 0r1(y ws escn e <br /> q. The contractor subcontractor and owner shall hold ereon&tddoesnote utho�zeorapprove any omission or <br /> viation lrotn requirements of state laws or local ordin� r C:) <br /> harmless indemnify and defend the plan maker and their <br /> domagesconsultan�arising Orany <br /> n tte ed allliability <br /> from the performance rmance of <br /> the work described in t otter <br /> construction documents. <br /> 10. The plan maker shall not have control over or charge <br /> methods, techniques sequences, or procedures or for <br /> safety precautions, and programs in connection with the ;L' <br /> ' <br /> work. Since theses are solely the contractors responsibility under the contract for construction, The plan maker shall CA NI 1 <br /> not be responsible for the contractors schedules or failure to � � s ' <br /> g � ,r��;; <br /> carry out the work in accordance with the contract 'e' } � � � <br /> documents. The plan maker shall not have control over or <br /> charge of acts oro °' °y II i OF AL <br /> missions of the contractor subcontractors rE <br /> or their agents o employees, or any other persons y� ' <br /> Performing par ins of the work. I Grade Site <br /> � i� J V I to Drain Away <br /> i <br /> if. Construction contractor agrees that in accordance with From Building <br /> generally accepted construction practices that he will be I I 2% Min. for <br /> e sole site conditions during the practices <br /> Ofnd iconstrucctionete of the 5 ft. Vic' <br /> project including the safet a responsibility for job <br /> Y f all persons and property that I I 00 <br /> this requirement shall be made to apply continuously and not Q <br /> to be limited to normal workina indern'ip- ,na b..a ._ N I I <br /> m.,L.�.. b,_._._., , <br />
The URL can be used to link to this page
Your browser does not support the video tag.