My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
1020
>
1900 - Hazardous Materials Program
>
PR0539446
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 11:07:44 AM
Creation date
6/8/2018 5:21:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539446
PE
1926
FACILITY_ID
FA0022551
STREET_NUMBER
1020
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
Rd
City
Lodi
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1020 S Beckman Rd
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\B\BECKMAN\1020\PR0539446\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/14/2015 8:20:50 PM
QuestysRecordID
2826609
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />MAR 14 2011 <br />SPILL CONTROL PROCEDURES SECTION SAN OAQUIN COUNTY <br />SPILL CONTROL LEADER (12) 800 -KNOW -EI -IS (800-566-9347) OFFICE OF ME%ENCYSE <br />(also oversees inspections of areas or RUlC�, <br />systems vulnerable to earthquakes) <br />'rHE FOLLOWING INDIVIDUALSIPOSITIONS ARE ASSIGNED'r0 HELP CONTROL A SPILL (13) <br />ALL FIELD TECHNICIANS AND MANAGERS <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of hazardous materials <br />on its property. Persons performing these actions will possess written procedures for performing them and will have received <br />training on the procedures and equipment needed. Locations of needed equipment are shown on the facility map. At a minimum <br />our business must Isolate the area of the spill and make notifications. <br />Spills of Liquid Materials <br />❑ Plug and Patch Container ®Neutralize Spilled Material <br />R Build Retention Dike ❑Secure System Valves and Closures <br />❑ Remove Sources of Ignition ❑ Shutdown System Involved <br />❑ Position Container so as to Stop Leak ®Apply Absorbent Material to Spill Area <br />❑ Reduce Pressure in Container/System ❑ N/A <br />R Isolate Area and Make Notifications <br />Release of Compressed Gases Spills of Solid or Powder Materials <br />❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br />❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br />❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br />❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br />❑ Isolate Arca and Make Notifications ® Isolate Area and Make Notifications <br />❑ Remove Sources of Ignition ❑ N/A <br />R N/A <br />AUTHORIZED CLEAN-UP COMPANIES SECTION (15) <br />These clean-up companies will be accessed in the event that our business must expend funds to clean up a hazardous materials spill. <br />800• KN O W -EI IS 800-566-9347 N/A <br />NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT' NO. <br />NAME 24 HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.