My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOZZANO
>
2851
>
1900 - Hazardous Materials Program
>
PR0521089
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 2:03:16 PM
Creation date
6/8/2018 5:34:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0521089
PE
1921
FACILITY_ID
FA0009229
FACILITY_NAME
CALIFORNIA FRUIT PROCESSORS
STREET_NUMBER
2851
Direction
N
STREET_NAME
BOZZANO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10108064
CURRENT_STATUS
01
SITE_LOCATION
2851 N BOZZANO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\B\BOZZANO\2851\PR0521089\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/7/2015 7:24:20 PM
QuestysRecordID
2827129
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA FRUIT PROCESSORS LLC <br />2851 N. BOZZANO ROAD <br />STOCKTON, CA 95215 RECEIVED <br />(209) 931-1760 <br />OVERVIEW MAY 15 2018 <br />ENVIRONMENTAL HEALTH <br />PERMITISERVICES <br />MAKING A TANK OF BRINE <br />The brine mixing person puts on his protective equipment: respirator, faceshield, <br />chemical resistant apron and chemical gloves. <br />Brine person fills tank to appropriate level with water and turns on the main tank <br />mixer. <br />He then puts the appropriate amount of sodium bisulfate into slurry tank. When <br />mixed, it is added into main tank. He then puts the appropriate amount of calcium <br />into the slurry tank. When mixed, it is added into main tank. He then puts the <br />appropriate amount of citric acid into slurry tank. When mixed it is added into <br />main tank. Main tank then continues mixing for 30 minutes. If any material is <br />spilled during the process, it is to be swept up with a broom and added into the <br />slurry tank for use in the main tank. <br />The brine is titrated to check PPM, SO2 and PH. Adjusted as needed to complete. <br />The reasons for these procedures to be followed is to reduce/eliminate potential <br />hazards of this job which have been explained to me. <br />Name:P_ CSq (,t.t' 1uw— <br />Signature: Ef %— v F14 , t. �C"/ <br />Dated: <br />\\CFPSVR2017\Users Shared Folders\SAFETY\SAFETY RULES\brine mix.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.