Laserfiche WebLink
EI <br />BI <br />AI <br />2 <br />'N <br />3 I 4 <br />LOCATION <br />9122 E SOUTH ORCHARD RD <br />WALL MAP -2271; PLAT -M; BLOCK -0; MP -10.26 <br />(SCALE: I'. 60h <br />9 10 <br />WARNING TAPE (TERM TAPE) <br />BACKFILL PER ENCROACHMENT INSTALL PER DPV L -IG <br />PERMO REQUIREMENTS IBOM K 19) <br />FINISHED GRADE <br />t <br />/ <br />0,11 <br />TOP OF PIPE / i <br />BACIFKLMATERIAL <br />i <br />PER PG&E EMS 9123 <br />6- <br />D <br />GAS PIPELINE <br />10L -197A <br />a <br />TYPICAL <br />TRENCH NON-PAVEDAREA <br />SCALE:NOSCALE NATIVERACKFILL <br />DETAIL 6 ATTACHINGTHE WIRES <br />SGIE: XONF TOTHF GASMAIN <br />sa�CCV 0.10, FIGURE 1 <br />ti <br />)ET 8 <br />C <br />7 WIRE5-KEEP 11UCE11O <br />\ <br />(❑ <br />A MINIMUM. SPLICE YELLOW <br />WIRE PER 'TYPICAL WESTERN <br />UNION SFLICP DETAIL <br />GROUND <br />GROUN <br />I <br />i ( <br />SEAL .LFA <br />NATIVE <br />� \Y/ <br />,ILL <br />9 <br />Ij <br />PIPE <br />POLARIZED <br />CONDUITf' <br />I <br />YELLOW WIRE MOM <br />REFERENCE CELL <br />NSTAIL REFERENCE ELECTRODE <br />WITHIN 12'fROM THE BOTTOM <br />I 2'CONDUIT <br />� <br />O <br />OF THETUBE. FILL TUBING WITH <br />ELECIRKMUD <br />16'MIN <br />i <br />F <br />REFERENCE [Ell <br />REFERENCE <br />TO ATLERIST12 <br />ABOVE <br />CELL <br />NATIVE <br />COUPON <br />THE <br />BE FILLLED WITH NATIVE SOIL <br />I — <br />B <br />- ------ ----------- <br />-_------ <br />COUPONS �l <br />C <br />I <br />(E) W L -197A <br />12-TO310- <br />INSTALL MH COUPONS a- TO 12" <br />EXISTING <br />PARALLEL TO PIPE <br />I <br />NPC COUPON ]0"TP <br />PC COUPON <br />U19)A <br />NOTINSTALL REFERENCE ELECTRODE WITHIN I2'FROM THE <br />BOTTOM OF THE TUBE FILL TUBING WITH CASING MUD TO AT <br />NOTE 7WIRESTO UNIT NPCIBIACKX2), <br />NOTE: COUPONS MUST BE INSTALLED IN NATIVE SOIL <br />LEAST I2°ABOVE REFERENCE ELECTRODE. THE REMAINDER <br />WIRE PC oFEX2), WIREREF CELL IYELLOWI, <br />NATIVE SOIL MUST BE WITHIN 1P OF ELECTRODE. <br />OF THETUBE CAN BE FILLED WITH NATIVE SOIL <br />�W <br />PIPE B30 BLACK X 2) WAGE SOLID WIRES <br />TAMP NATIVE SOIL AND ADD IMPORT TO ACHIEVE <br />A MINIMUM 93% COMPACTION. <br />SECTION Y <br />SEMS �RANSMISSIONN <br />SCALE: NTS <br />p <br />DETAIL $ [DUPON TESTSTATION HEAD <br />PER CCV 0-10.2. FIGURE I <br />SECTION A <br />DETAIL 6 COUPONROUND <br />SCALE: NONE <br />SCALE: NONE <br />ABOVE GROUND W1 OFFSET <br />W1 OF <br />SCALE NTS <br />CCV 0-103 <br />L <br />Al <br />.=....Mr <br />.. <br />T-17KRWIq <br />rwnlo <br />runueawaw <br />PLI-PELINE- DETAILS <br />197A MP 10.26 <br />RU.— <br />ta• <br />r <br />PLeLw<RaKDamEFV[naNR.KwD <br />D <br />Nor <br />'DEEP WELL ANODEINSTALL 200 <br />7 <br />C -70 <br />vrtnrd <br />c.�PAnr ANiPwnR <br />Ys[anLrn <br /><wwwnrrA <br />ACAMPO, CALIFORNIA <br />L <br />Auixorno[m[o <br />cen <br />PACRKGAFAXP <br />ioerxMisAM[rPE°r[[F <br />BMRBBFI'6 below.DIV <br />_ .. .___ <br />®". <br />a ewmrammwox nvro6 nn <br />�REVIS10NS r.nw,F <br />P< <br />wrr Wwsr <br />mnwawRsoRA mrwspx <br />PACIFIC GAS AND ELECTRICFORFUACOMPANY <br />WORn . w F rMn3 <br />p°s <br />oncA[Co <br />CBII BIIBIB POO BIO. <br />sllmrN <br />SAN FRANUSCO, CALIFORNIA <br />31179016 0 <br />- <br />2 <br />pl <br />3 4 <br />5 dl <br />6 7 <br />118 <br />,wrwrw.w.r." 9 wwwx�.www. <br />10 .`. <br />