My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3845
>
1900 - Hazardous Materials Program
>
PR0520388
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:42:30 AM
Creation date
6/9/2018 2:00:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0520388
PE
1921
FACILITY_ID
FA0010498
FACILITY_NAME
DEL RIO WEST PALLET
STREET_NUMBER
3845
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525057
CURRENT_STATUS
01
SITE_LOCATION
3845 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\3845\PR0520388\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
7/18/2016 11:54:37 PM
QuestysRecordID
3142413
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN SIDE 2 <br /> SPILL CONTROL PROCEDU ES SJE TIO <br /> SPILL CONTROL LEADER(12) <br /> (also oversees inspections of areas or 1 d <br /> systems vulnerable to earthquakes) <br /> TH OLLOWING INDIVIDUAT 97SIT/IONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) JAN 16 2001 <br /> LC 0 f b63OSS c0 F�e£I SERV, �S <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shutdown System Involved <br /> ❑ Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> ❑ Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> �Release of Compressed Gases Spills of Solid or Powder Materials <br /> Hyl Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> (7❑'� Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition - ❑ <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> mat als spill. <br /> �`�th� �Fl ���o 6�saoq- 9�3�i�yy <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SIC 12/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.