Laserfiche WebLink
RECEIVED <br />CERS Consolidated Emergency Response / Contingency Plan — Page 4 of 4 �� 1 1 2�� Rev. 06/27/11 <br />H. EARTHQUAKE VULNERABILITY ENVIRONMENTAL <br />EAU P <br />Identify areas of the facility that are vulnerable to hazardous materials releases / spills due to earthquake -related motion. These areas require immediate isolation and <br />inspection. <br />VULNERABLE AREAS: (Check all that apply) H1. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Identify mechanicals stems vulnerable to releases / spills due to earthquake -related motion. Theses stems require immediate isolation and inspection. <br />VULNERABLE SYSTEMS: (Check all that apply) H6• <br />Ll 1. SHELVES, CABINETS AND RACKS <br />H7. <br />r ' H8. <br />Ll 2. TANKS (EMERGENCY SHUTOFF) <br />❑ 3. PORTABLE GAS CYLINDERS <br />❑ 4. EMERGENCY SHUTOFF AND/OR UTILITY VALVES <br />1110' <br />❑ S. SPRINKLER SYSTEMS <br />IL <br />❑ 6. STATIONARY PRESSURIZED CONTAINERS (e.g., Propane dispensing tank) <br />H12. <br />I. EMPLOYEE TRAINING <br />Explanation of Requirement: Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations <br />including volunteers and/or contractors. Training must be: <br />• Provided within 6 months for new hires; <br />• Amended as necessary prior to change in process or work assignment; <br />• Given upon modification to the Emergency Response/ Contingency Plan, and updated/refreshed annually for all employees. <br />Required content includes all of the following: <br />• Material Safety Data Sheets; • Communication and alarm systems; <br />• Hazard communication related to health and safety; • Personal protective equipment; <br />• Methods for safe handling of hazardous substances; • Use of emergency response equipment (e.g, Fire extinguishers, respirators, <br />• Fire hazards of materials / processes; etc.); <br />. Conditions likely to worsen emergencies; • Decontamination procedures; <br />• Coordination of emergency response; • Evacuation procedures; <br />• Notification procedures; • Control and containment procedures; <br />• Applicable laws and regulations; • UST monitoring system equipment and procedures (if applicable). <br />INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED (Check all that apply) 11. <br />❑ 1. FORMAL CLASSROOM; ❑ 2. VIDEOS; ® 3. SAFETY / TAILGATE MEETINGS; <br />❑ 4. STUDY GUIDES / MANUALS (Specify): 12. <br />❑ 5. OTHER (Specify): 13. <br />❑ 6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br />Large Quantity Generator (LQG) Training Records: Large quantity hazardous waste generators (i.e., who generate more than 270 gallons/1,000 kilograms of <br />hazardous waste per month) must retain written documentation of employee hazardous waste management training sessions which includes: <br />• A written outline/agenda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having <br />responsibility for the management of hazardous waste (e.g., labeling, manifesting, compliance with accumulation time limits, etc.). <br />• The name, job title, and date of training for each hazardous waste management training session given to an employee filling such a job position; and <br />• A written job description for each of the above job positions that describes job duties and the skills, education, or other qualifications required of personnel assigned <br />to the position. <br />• Current employee training records must be retained until closure of the facility. <br />• Former employee training records must be retained at least three years after termination of employment. <br />J. LIST OF ATTACHMENTS <br />(Check one of the following) 11' <br />E 1. NO ATTACHMENTS ARE REQUIRED; or <br />❑ 2. THE FOLLOWING DOCUMENTS ARE ATTACHED: rZ' <br />K.. SIGNATURE / CERTIFICATION; <br />Certification: Based on my inquiry of those individuals responsible for obtaining the information, I certify under penalty of law that I have personally examined and <br />am familiar with the information submitted and believe the information is true, accurate, and complete, and that a copy is available on site. <br />S ATURE OF WNF,R16,OPERATOR <br />DATE SIGNED K1. <br />7/9/2018 <br />NAMVF SIGNER (print) K2• <br />TITLE OF SIGNER K3. <br />Mike Villasenor <br />Owner <br />