From: "Shay Roseman" <shay.roseman@sherwin.com>
<br /> Subject: RE: Business Plan Submittal
<br /> Date: October 26, 2006 12:20:08 PM PDT
<br /> To: "Robert Lopez" <rlopez@sjgov.org>
<br /> Thank you for the e-mail with the line itemed corrections. I will take care of this as soon as possible.
<br /> Shay
<br /> -----Original Message-----
<br /> From: Robert Lopez [mailto:rlopez@sjgov.org]
<br /> Sent: Wednesday, October 25, 2006 7:59 PM
<br /> To: Shay.roseman@sherwin.Com
<br /> Subject: Business Plan Submittal
<br /> The corrections to the Business Plan/Chemical Inventory have not been completed satisfactorily. Consequently,it is
<br /> necessary for you or a representative of your company/organization to come into the office to receive assistance in
<br /> completing the corrections required for the Business Plan to be accepted.
<br /> As a courtesy,an appointment to complete the necessary corrections has been scheduled for November 8.2006 pt
<br /> 08:30 A.M. Please, call to confirm that you will be able to attend at the scheduled date and time or if you need to
<br /> reschedule. If the required corrections are completed and accepted before that date, it will not be necessary
<br /> for you to attend.
<br /> A. Business Owner/Operator Identification Page:
<br /> 1 . Side 2 - Complete/Correct #47 and #50 .
<br /> B. Hazardous Materials Management Plan:
<br /> 1 . Side 1 and 2 have not been received.
<br /> C . Facility Map:
<br /> 1 . A facility map submitted on the 8 . 5" x 11" map page form, that
<br /> shows the following information: loading areas , internal roads ,
<br /> adjacent property use, access and egress roads , underground water
<br /> systems or wells , parking lots , storm drains , sewer drains , flow of
<br /> surface water, employee evacuation assembly area, facility entrances &
<br /> exits , spill control equipment, emergency respirators, first aid
<br /> supplies , fire extinguishers, fire alarms , eye wash stations , shut off
<br /> valves , and the location and type of container of each hazardous
<br /> material listed in the chemical inventory, has not been received.
<br /> D. Chemical Description Page:
<br /> 1 . Aerosols, correct/complete #6, #7 , #33 and #34 .
<br /> 2 . Lacquers, correct/complete #6, #7 , #33 and #34 .
<br /> 3 . Latex Paint, correct/complete #6, #7, #33 and #34 .
<br /> 4 . Oil Based Drywall Products, correct/complete #6 , #7 , #33 and #34 .
<br /> 5 . Paint Related Waste, correct/complete #6 , #7, #25 , #33 and #34 .
<br /> 6 . Solvent Base Primers, correct/complete #6, #7 , #33 and #34 .
<br /> 7 . Solvent Base Paint, correct/complete #6 , #7 , #33 and #34 .
<br />
|