My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3507
>
1900 - Hazardous Materials Program
>
PR0520699
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:33:05 AM
Creation date
6/9/2018 9:05:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520699
PE
1919
FACILITY_ID
FA0002197
FACILITY_NAME
TACO BELL #2832
STREET_NUMBER
3507
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07118019
CURRENT_STATUS
01
SITE_LOCATION
3507 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3507\PR0520699\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/2/2016 11:42:50 PM
QuestysRecordID
3159492
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARj MATERIALS MANAGEMENT PIf� _`SIDE 2 ---.� <br /> 5 On <br /> SPILL CONTROL PROCEDURES SECTIO�;:`; ' i <br /> XV 2 41998 <br /> SPILL CONTROL LEADER(11) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(12)- ------ <br /> AUTHORIZED SPILL CONTROL STRATEGIES(13) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shut Down System Involved <br /> ❑ Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> ❑ Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release <br /> ❑ Neutralize Spilled Material <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> El <br /> AUTHORIZED CLEANUP COMPANIES SECTION <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SIC 12/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.