My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
1900 - Hazardous Materials Program
>
PR0520328
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:55:10 PM
Creation date
6/10/2018 11:28:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0520328
PE
1921
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1010\PR0520328\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/2/2017 9:57:47 PM
QuestysRecordID
3716051
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />'SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN <br />SPILL CONTROL PROCEDURES SECTION <br />SPILL CONTROL LEADER (11) PRODUCTION SUPVR <br />THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (12) <br />MAINT <br />PAGE 2 <br />AUTHORIZED SPILL CONTROL STRATEGIES (13) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of hazardous materials <br />on its property. Persons performing these tasks will possess written procedures for performing them and will have received training <br />on the procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. <br />At a minimum our business must isolate the area of the spill and make notifications. <br />Spills of Liquid Materials <br />p Plug and Patch Container M Neutralize Spilled Material <br />N Build Retention Dike N Secure System Valves and Closures <br />p Remove Sources of Ignition ® Shutdown System Involved <br />® Position Container so as to Stop Leak p Apply Absorbent Material to Spill Area <br />® Reduce Pressure in Container/System p Other... <br />® Isolate Area and Make Notifications <br />Release of Compressed Gases <br />M Shut Off Valves/Systems <br />® Ventilate Area of Release <br />® Reduce Pressure in Container/System <br />N Suppress Vapors with Water <br />M Isolate Area and Make Notifications <br />p Remove Sources of Ignition <br />p Other... <br />Spills of Solid or Powder Materials <br />p Cover Spill to Prevent Spread <br />p Neutralize Spilled Materials <br />p Position Container so as to Stop Leak <br />N Place Spilled Material into Drum or Bag <br />N Isolate Area and Make Notifications <br />p Other... <br />The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br />materials spill. <br />N/A <br />NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />N/A <br />NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />Date Created Date Modified 4/6/99 Last Modified By: FMP Server <br />
The URL can be used to link to this page
Your browser does not support the video tag.