My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
2055
>
1900 - Hazardous Materials Program
>
PR0526786
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 11:19:36 AM
Creation date
6/10/2018 11:30:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526786
PE
1921
FACILITY_ID
FA0018143
FACILITY_NAME
HOME DEPOT USA INC.
STREET_NUMBER
2055
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17733020
CURRENT_STATUS
01
SITE_LOCATION
2055 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\2055\PR0526786\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
7/24/2017 11:29:57 PM
QuestysRecordID
3527718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��CE11/E� <br /> SPILL CONTROL PROCEDURES SECTION 'AN —4 2012 <br /> SPILL CONTROL LEADER(12) FRANK POST Cnet <br /> (also oversees inspections of areas or DAQU <br /> systems vulnerable to earthquakes) 01}Jft": ,M CQCNIY <br /> � NCYSFRVICEB <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> 7 <br /> FRANK POST,WAREHOUSE MANAGER <br /> HENTRY MAGALLON,ASSISTANT WAREHOUSE MANAGER <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials <br /> on its property. Persons performing these actions will possess written procedures for performing them and will have received <br /> training on the procedures and equipment needed. Locations of needed equipment are shown on the facility map.At a minimum <br /> our business must isolate the area of the spill and make notifications. <br /> E Spills of Liquid Materials <br /> ❑Plug and Patch Container ❑Neutralize Spilled Material <br /> ❑Build Retention Dike ❑Secure System Valves and Closures <br /> ❑Remove Sources of Ignition ❑Shutdown System Involved <br /> ®Position Container so as to Stop Leak ®Apply Absorbent Material to Spill Area <br /> ❑Reduce Pressure in Container/System ❑N/A <br /> ®Isolate Area and Make Notifications <br /> IRelease of Compressed Gases Spills of Solid or Powder Materials <br /> I <br /> ®Shut Off Valves/Systems ❑Cover Spill to Prevent Spread <br /> f ®Ventilate Area of Release ❑Neutralize Spilled Materials <br /> I <br /> ❑Reduce Pressure in Container/System ❑Position Container so as to Stop Leak <br /> ❑Suppress Vapors with Water ®Place Spilled Material into Drum or Bag <br /> ®Isolate Area and Make Notifications ®Isolate Area and Make Notifications <br /> ®Remove Sources of Ignition ❑N/A <br /> ❑N/A <br /> AUTHORIZED CLEAN-UP COMPANIES SECTION (15) <br /> These clean-up companies will be accessed in the event that our business must expend funds to clean up a hazardous materials spill. <br /> PSC 1-877-577-2669 <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> Attachments: Attachment A: Business Emergency Response Plan Details <br /> Attachment B: Employee Emergency Training Details <br />
The URL can be used to link to this page
Your browser does not support the video tag.