My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
750
>
1900 - Hazardous Materials Program
>
PR0539150
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 2:01:03 PM
Creation date
6/10/2018 11:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539150
PE
1921
FACILITY_ID
FA0010575
FACILITY_NAME
AT&T MOBILITY - GLENWOOD (USID9846)
STREET_NUMBER
750
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
750 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\750\PR0539150\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
4/14/2016 8:57:13 PM
QuestysRecordID
2917318
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN PAGE 2 <br /> SPILL CONTROL PROCEDURES SECTION <br /> SPILL CONTROL LEADER(12) LAURA KISER <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> ALL FIELD TECHNICIANS AND MANAGERS <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on <br /> its property. Persons performing these actions will possess written procedures for performing them and will have received training <br /> on the procedures and equipment needed. Locations of needed equipment are shown on the facility map.At a minimum our <br /> business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑Plug and Patch Container ❑Neutralize Spilled Material <br /> ❑Build Retention Dike ❑Secure System Valves and Closures <br /> ❑Remove Sources of Ignition ❑Shutdown System Involved <br /> ❑Position Container so as to Stop Leak ❑Apply Absorbent Material to Spill Area <br /> ❑Reduce Pressure in Container/System ❑Other... <br /> ®Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑Shut Off Valves/Systems ❑Cover Spill to Prevent Spread <br /> ❑Ventilate Area of Release ❑Neutralize Spilled Materials <br /> ❑Reduce Pressure in Container/System ❑Position Container so as to Stop Leak <br /> ❑Suppress Vapors with Water ❑Place Spilled Material into Drum or Bag <br /> ❑Isolate Area and Make Notifications ®Isolate Area and Make Notifications <br /> ❑Remove Sources of Ignition ❑Other... <br /> ®Other... <br /> AUTHORIZED CLEAN-UP COMPANIES SECTION (15) <br /> These clean-up companies will be accessed in the event that our business must expend funds to clean up a hazardous materials spill. <br /> N/A N/A N/A <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.