My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
750
>
1900 - Hazardous Materials Program
>
PR0539150
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 2:01:03 PM
Creation date
6/10/2018 11:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539150
PE
1921
FACILITY_ID
FA0010575
FACILITY_NAME
AT&T MOBILITY - GLENWOOD (USID9846)
STREET_NUMBER
750
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
750 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\750\PR0539150\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
4/14/2016 8:57:13 PM
QuestysRecordID
2917318
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Describe procedures for notifying onsite emergency response personnel and outside <br /> agencies (e.g., Fire, Health, Police, State OES) needed during hazardous materials <br /> emergencies. <br /> This is an unmanned facility <br /> 5. Describe any security system or equipment that could impede site access by <br /> emergency responders. <br /> The facility is secured with a chain-link fence that is closed and locked during non-business <br /> hours In addition all doors are kept locked and the alarm is activated after hours. <br /> OR: Possible fence and locks in place for access. <br /> 6. Describe procedures for notification and evacuation of visitors and employees during <br /> hazardous materials emergencies. Primary and alternate evacuation routes and <br /> assembly areas must be clearly identified on the site map. <br /> This is an unmanned facility. In the event personnel are present, verbal notification <br /> will be made. Evacuate away from the facility to the street. <br /> 7. Describe mitigation or clean-up procedures to be implemented by onsite personnel in <br /> the event of a release, threatened release, fire or explosion involving hazardous <br /> materials. Indicate if the business has an onsite emergency response team (ERT) and <br /> if so,describe how the ERT will interact with outside emergency response agencies <br /> if additional assistance is required. <br /> The person discovering the spill will: Keep others out of the area, attempt to stop the <br /> flow of the leak wear protective equipment and use spill kit to absorb the leak. if the <br /> leak/release is beyond the persons capabilities, they will call 9-1-1 immediately <br /> 8. Describe procedures for immediate inspection, isolation, and shutdown of equipment <br /> or systems that may be involved in a hazardous materials release or threatened <br /> release. <br /> Visual inspection of all affected areas or equipment will occur immediately. An leaking <br /> eaking <br /> containers or equipment will be isolated and appropriate mitigation procedures will be <br /> implemented <br />
The URL can be used to link to this page
Your browser does not support the video tag.