Laserfiche WebLink
Emergency Response/Contingency Plan <br /> (Hazardous Materials Business Plan) <br /> Authority Cited: HSC§25504(b); 19 CCR§2731;22 CCR§66262.34(a)(4) <br /> All facilities that handle hazardous materials in HMBP quantities must have a written emergency response plan. In addition,facilities <br /> that generate 1,000 kilograms or more of hazardous waste (or more than 1 kilogram of acutely hazardous waste or 100 kilograms of <br /> debris resulting from the spill of an acutely hazardous waste)per month,or accumulate more than 6,000 kilograms of hazardous waste <br /> on-site at any one time, must prepare a hazardous waste contingency plan. Because the requirements are similar, they have been <br /> combined in a single document, provided below, for your convenience. This pian is a required module of the Hazardous Materials <br /> Business Plan (HMBP). If you already have a plan that meets these requirements, you should not complete the blank plan, <br /> below,but you must include a copy of your existing plan as part of your HMBP. <br /> This site-specific Emergency Response/Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br /> immediately whenever there is a fire, explosion, or release of hazardous materials that could threaten human health and/or the <br /> environment. At least one copy of the plan shall be maintained at the facility for use in the event of an emergency and for <br /> inspection by the local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency with <br /> whom special(i.e.,contractual)emergency services arrangements have been made(see section 3, below). <br /> 1. Evacuation Plan <br /> a. The following alarm signal(s)will be used to begin evacuation of the facility(check all that apply): <br /> ❑Bells; ❑Homs/Sirens; ®Verbal(i.e., shouting); ®Other(specify PA system announcements&instructions <br /> b. ®Evacuation map is prominently displayed throughout the facility. <br /> Note: A properly completed HMBP Site Plan satisfies contingency plan map requirements. This drawing(or any other drawing that <br /> shows primary and alternate evacuation routes, emergency exits, and primary and alternate staging areas) must be <br /> prominently posted throughout the facility in locations where it will be visible to employees and visitors. <br /> 2. a. Emergency Contacts <br /> Fire/Police/Ambulance Phone No.: 911 <br /> -------------------------------------------------------- <br /> State Office of Emergency Services Phone No.: (800)852-7550 <br /> -------------------------------------------- <br /> b.Post-Incident Contacts <br /> Certified Unified Program Agency(CUPA) _ _ __ ______ Phone No.: (209)468-3420 <br /> Local Hazardous Materials Program _ Phone No.: (209)953-6200/468-4400 <br /> California EPA Department of Toxic Substances Phone No.: (800)728-6942 <br /> Cal OSHA Division of Occupational Safety and Health __ _ Phone No.: (916)274-5721 <br /> Air-Quality Management District Phone No.: (209)557-6400 <br /> Regional Water Quality Control Board Phone No. (916)341-5568 <br /> *Phone numbers for agencies in Undoes Member Agency geographic jurisdictions are available at www.unidocs.ore. <br /> c. Emergency Resources <br /> Poison Control Center* Phone No.: (800)876-4766 <br /> Nearest Hospital: Name: Lodi Memorial Hospital Phone No.: (209)334-3411 <br /> Address: 975 S Fairmont Avenue City:Lodi <br /> 3. Arrangements with Emergency Responders <br /> If you have made special(i.e.,contractual)arrangements with any police department,fire department,hospital,contractor,or <br /> State or local emergency response team to coordinate emergency services,describe those arrangements below: <br /> No special arrangements have been made with local or State departments, contractors, emergency response teams or services <br /> S-Mart#209 Page 5 of 16 March 2011 <br />