Laserfiche WebLink
SAN J©AQUIN COUNTY HAZARDS MATERIALS MANAGEMENT PIN Page 2 of 3 <br />(10) <br />iJiG.i.oY:.a v i.sII,J <br />OFFICE <br />n± <br />SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br />The following types of neighbors (e.g. residential, commercial, open space) are loca%dwithin 119fh mile of our facility. <br />Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br />should be provided to the 9-1-1 operator at the time of the initial notification. <br />NORTH CARPET WHSE, SALAS PARK EAST NEW SUBDIVISION <br />SOUTH BODY SHOP, DAYCARE CNTER WEST AAA AUTO BODY SHOP <br />SPILL CONTROL PROCEDURES SECTION <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br />mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br />are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br />notification. <br />SPILL CONTROL LEADER (12) JAIME OR JAVIER DEL CASTILLO <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />RAUL SUAREZ - CORN LINE PM, ?b;l QQS-T� - FLOUR LINE AM :AUl eVL aY e -)e44 Poo L <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br />hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br />hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br />needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br />make notifications. <br />SPILLS OF LIQUID MATERIALS <br />❑ Plug and Patch Container P, Build Retention Dike <br />❑ Remove Sources of Ignition R',.. Position Container so as to Stop Leak <br />❑ Reduce Pressure in Container/System r Isolate Area and Make Notifications <br />❑ Neutralize Spilled Material ❑ Secure System Valves and Closures <br />❑ Shutdown System Involved ET Apply Absorbent Material to Spill Area <br />❑ N/A <br />RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br />F-1 Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br />❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br />❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br />❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br />❑ Isolate Area and Make Notifications R Isolate Area and Make Notifications <br />❑ Remove Sources of Ignition ❑ N/A <br />❑ N/A C Rinse away through drain <br />PILLS OTHER <br />AUTHORIZED CLEANUP COMPANIES SECTION (15) <br />The following cleanup companies will be accessed in the event that our business must expend funds to <br />clean up a hazardous materials spill. <br />http://sjoesdata.orglsection_tablesl m mp_ps_review.lasso?-Database=transaction+Plan+File&-Table=cd... 1/16/2004 <br />