My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2610
>
1900 - Hazardous Materials Program
>
PR0521096
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 12:47:01 PM
Creation date
6/10/2018 12:41:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521096
PE
1919
FACILITY_ID
FA0002006
FACILITY_NAME
CARLS JR #495/7485
STREET_NUMBER
2610
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95207
APN
11002002
CURRENT_STATUS
01
SITE_LOCATION
2610 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Supplemental fields
FilePath
\MIGRATIONS\M\MARCH\2610\PR0521096\COMLIANCE INFO.PDF
QuestysFileName
COMLIANCE INFO
QuestysRecordDate
9/17/2015 9:12:42 PM
QuestysRecordID
2865518
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZAR1,0US MATERIALS MANAGEMENT PC.rY SIDE 2 <br /> SPILL CONTROL PROCEDURES SECTION <br /> q <br /> SPILL CONTROL LEADER(12) tC -tF—C kX <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROLRE0,VUED <br /> S eS<r8 A N A r� �rJ Vtd tt t{E( c W S _zeal <br /> e sv� <br /> ��.(�S C�-rp�y�- ppUINCUUN� <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> pFir►t'kpFE '1 <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> El/Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shutdown System Involved <br /> EY/Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area _ <br /> ❑ Reduce Pressure in Container/System ❑ <br /> ❑ Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> Q/Shut Off Valves/Systems Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> D/Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> El <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SJC 12/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.