My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19681
>
1900 - Hazardous Materials Program
>
PR0521176
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:00 PM
Creation date
6/11/2018 8:16:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521176
PE
1920
FACILITY_ID
FA0013801
FACILITY_NAME
SPECIALIZED TRUCK SERVICE
STREET_NUMBER
19681
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
(none)
City
ACAMPO
Zip
95220-9799
APN
01321051
CURRENT_STATUS
Active, billable
SITE_LOCATION
19681 N HWY 99
P_LOCATION
99
P_DISTRICT
004
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\19681\PR0521176\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
6/10/2016 10:13:27 PM
QuestysRecordID
3073357
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN DE 2 <br /> RGWEEV <br /> SPILL CONTROL PROCEDURES SEC <br /> SPILL CONTROL LEADER(12) eerL A. ti£.a FEB 25 <br /> 2002 <br /> inspections(also oversees or S <br /> systems vulnerable oearth earthquakes) 7flflFEAERGENCYSERVICE: <br /> THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED <br /> �T,OHELP CONTROL LVED <br /> SAMjuA[A1FF OF MERGENCYSERVICE: <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑ Plug and Patch Container ❑ Neutralize Spilled Material <br /> ❑ Build Retention Dike ❑ Secure System Valves and Closures <br /> ❑ Remove Sources of Ignition ❑ Shutdown System Involved <br /> ❑ Position Container so as to Stop Leak Apply Absorbent Material to Spill Area <br /> ❑ Reduce Pressure in Container/System ❑ <br /> Isolate Area and Make Notifications <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition ❑ <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> r4u.tEwc ttJ O (- Woke. SE¢�tc6S. goo. -73Z. 4-(045- <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> NAME 24-HOUR TELEPHONE NO. AGREEMENT/CONTRACT NO. <br /> SIC 12/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.