Laserfiche WebLink
HAZARDOUS MATERIALS BUSINESS PLAN <br />FACIL2TY EMPLOYEE TRAINING RECORD <br />For use by Unidocs 1femberAgencies or where approved by your Local Jurisdiction <br />Authority Cited. • California Health and Safery Code Chapter 6.95 (HSC); Title 19 California Code ojRegulationr (CCR) <br />Facility Name: TURNER CUT RESORT <br />Site Address: UGEBAUER ROAD <br />51OCKTON Cel IF og2g6 City: <br />California Health and Safety Code §25507(a) and Title 19 California Code of Regulations §2651(a) require that a <br />Hazardous Materials Business Plan (HMBP) facility implement its HMBP, including the training plan specified in <br />HSC §25505(a)(4) and 19 CCR §2659(a)(4). Taking into account the position of each employee, training for new <br />employees must be provided in safety procedures in the event of a release or threatened release of a hazardous <br />material. Annual refresher training is required. This training must be documented electronically or by hard coP.1 <br />records. Training records for the past three years must be kept available for inspection <br />HMBP training must include, but is not limited to, the following: <br />10 Methods for safe handling of hazardous materials; <br />Identification of areas of the facility and mechanical or other systems that require immediate inspection or <br />isolation because of their vulnerability to earthquake related ground motion; <br />® Evacuation plans and procedures, including immediate notification, for the facility. <br />❑ Identification of local emergency medical assistance appropriate for potential accident scenarios; <br />❑ Notification of local emergency response personnel, the Unified Program Agency, the California Emergency <br />Management Agency, and persons within the facility who are ® necessary to respond to an incident: Emergency response and safety procedures for the mitigation. prevention, and abatement of a release or <br />threatened release to minimize harm or damage to persons, property, or the environment; <br />Use of the facility's emergency response equipment and supplies; <br />Procedures for coordination with local emergency response organizations. <br />The following emnlnveech.,.er.m.. :_ ----- __.. --..__----- <br />- u a �u <br />Em 10 e Name <br />as m urrea oy 115tr <br />Trainin Date <br />1DM7(a) and 19 CCR 2651 a : <br />Trainer Name <br />