My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILCOX
>
2354
>
1900 - Hazardous Materials Program
>
PR0527121
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:52:00 AM
Creation date
6/12/2018 8:47:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527121
PE
1921
FACILITY_ID
FA0018380
FACILITY_NAME
TULEBURG TOWING
STREET_NUMBER
2354
Direction
N
STREET_NAME
WILCOX
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10102175
CURRENT_STATUS
01
SITE_LOCATION
2354 N WILCOX RD
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\W\WILCOX\2354\PR0527121\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/28/2015 6:31:45 PM
QuestysRecordID
2903688
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 19 07 09: 39a .lames Paulk (209) 9413-2446 P. 7 <br /> SAN ,IOAOUIN COUNTY HAZARDO MATERIALS MANAGFMF.NT PIAN SIDE 2 RECEIVED <br /> SPILL CONTROL PROCEDURES SECTION JAW T ( 2007 <br /> SPILL CONTROL LEADER (12) f ®® QFFj(JE N SME IN UUUN 1Y <br /> SERVICES <br /> (aISCr C1VerSttS inspections ofareas or <br /> systems vulnerable to earthquakes) <br /> THE FOILOWTNG INDIVIDTTAI.S/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perforin the action(s)indicated below to control spills of hazardous materials on its <br /> property. Persons perfonning these tasks will possess written procedures for performing them and will have received training on the i <br /> procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> Spills of Liquid Materials <br /> ❑_,Plug and Patch Container ❑ Neutralize Spilled Material <br /> Build Retention Dike ❑ Secure.System Valves and Closures <br /> Remove Sources of Ignition ❑ Shutdown System Involved <br /> Position Container so as to Stop Leak ❑ Apply Absorbent Material to Spill Area <br /> tReduce Pressure in ContaineT/System ❑ <br /> 0 Isolate Area and Make Notifications <br /> -- I <br /> Release of Compressed Gases Spills of Solid or Powder Materials <br /> ❑ Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System � Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spill,d Material into Drum or Bag <br /> ❑ isolate Area and Make Notifications Isolate Area and Make Notification <br /> ❑ Remove Sources of Ignition <br /> AUTHORIZED CLEANUP COMPANIES SECTION (I5) <br /> The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br /> materials spill. <br /> NAME 24-HOUR TELEPHONE NO: AGREEMENT/CONTRACT NO: <br /> NAME 24-HOUR TELEPHONtiTE NO., AGREEMENT/CONTRACT NQ_ <br /> SJC 12103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.