My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0037334
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
27700
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0037334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 3:20:57 PM
Creation date
6/27/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0037334
PE
4369
FACILITY_NAME
OSPITAL, JOHN S & DEBRA S TR
STREET_NUMBER
27700
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240
APN
06720001
ENTERED_DATE
6/27/2018
SITE_LOCATION
27700 E BRANDT RD
RECEIVED_DATE
9/19/2017
P_LOCATION
99
P_DISTRICT
004
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF DRAWINGS <br />1. VICINITY MAP <br />2. OSPITAL STOCK WATER SYSTEM <br />1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE DRAWINGS AND SPECIFICATIONS. <br />2. NO CHANGES ARE TO BE MADE TO THE DRAWINGS OR SPECIFICATIONS WITHOUT THE PRIOR APPROVAL OF <br />THE ENGINEER. <br />3. WRE PARTICIPANT SHALL BE RESPONSIBLE FOR OBTAINING ANY REQUIRED PERMITS. EASEMENTS, <br />RIGHT-OF-WAYS IN ADDITION TO MEETING ALL LEGAL REQUIREMENTS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE AND PROTECTING ALL UTILITIES. SPECIAL SAFETY PRECAUTIONS <br />SHALL BE TAKEN WHEN WORKING IN THE VICINITY OF GAS, OIL AND ELECTRICAL LINES. <br />S. CONTACT UNDERGROUND SERVICE ALERT BY DIALING 811, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION <br />FOR UTILITY LOCATION SERVICES. THIS IS THE LAW PER CALIFORNIA GOVERNMENT CODE 4216. YOU MAY BE <br />FINANCIALLY RESPONSIBLE FOR DAMAGE TO UTILITIES. <br />6. Cal -OSHA SAFETY REQUIREMENTS SHALL BE IN EFFECT DURING ALL CONSTRUCTION ACTIVITIES. <br />7. A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO BEGINNING CONSTRUCTION. THE PARTIES WITH <br />INTEREST IN THIS PROJECT OR PROPERTY SHALL BE PRESENT INCLUDING THE CONTRACTOR. <br />8. CONSTRUCTION INSPECTIONS ARE REQUIRED THROUGHOUT THE CONSTRUCTION PROCESS. SEETHE PRACTICE <br />REQUIREMENTS FOR THE CONSTRUCTION INSPECTION SCHEDULE. <br />JOB CODES: <br />WATER WELL (642) <br />PUMPING PLANT, SOLAR (533C) <br />LIVESTOCK PIPELINE (516) <br />WATERING FACILITY (614) <br />APPROX. <br />EASEMENT <br />///MAXIMUM <br />ENGINEERING JOB CLASS: <br />IV <br />BOUNDARY ------ <br />e <br />MAXIMUMSTATIC PRESSURE ON PIPE: <br />12 PSI <br />5rock4knasrsr[ni—I(/ <br />STORAGE CAPACITY: <br />5,000 GALLONS <br />WELL PRODUCTION: <br />11 GPM <br />OSP/TW INRE <br />A. <br />T <br />�51 <br />OSP—WRE-Wo6 <br />3000 6000 9000 <br />Sco/e in Feet <br />1 of J <br />
The URL can be used to link to this page
Your browser does not support the video tag.