Laserfiche WebLink
May. 9, 2018 7:11AM Canepa & Sons <br />No, 1478 P. 3 <br />Tylor McMillans Well Service <br />12302 Andes Ave, Bakersfield CA, 93312 <br />Phone: (916) 761-5224 Email: nlcmillanS521 a antail.com <br />Website' www.wcllblaster.com <br />Date: May 8, 2018 <br />BLASTING WORK PLAN <br />Well: I Location: 1020 W. Forest Lake Rd. Plan date and time: Pending <br />Casing 10 -inch ID Steel to 280 feet Acampo, CA <br />150' <br />200' Site procedure <br />I. Check site and measure well depth <br />2. Clear work site of all unessential personal <br />3. Lower charges and drop pipe into the well <br />4. Pump sealing material to top of well <br />S. Check and clear blast area (sound blast warning) <br />250' 6. Arm explosives <br />7. Confirm area clear (final blast warning) <br />8. Detonate charge <br />9. Check hole and sound all clear <br />10. Refill cement to top of well to form a mushroom cap <br />300' <br />Name of Blaster Preparing Plan: Tylor McMillan <br />Total Explosives <br />7.28 lbs. 'TylOr McMillan's'lWell Service reserves the right to change or modify the charge in <br />350' any way necessary to maintain the safety of all personnel onsite and in surrounding <br />areas. <br />400' <br />450' <br />Received Time May, 9. 2018 7:21AM No,3496 <br />Sealing pipe <br />Detonsnion pressure <br />207 <br />k/bar <br />GL <br />Total energy ea. <br />13,997 <br />k/bar <br />Pressure at casing <br />26.73 <br />k/bsr <br />400,148 <br />psi <br />' <br />Pressure at 10 feet <br />0.00 <br />29 <br />psi <br />,11 Detonator placed at 20 feet <br />Explosive Cord <br />50' <br />Density glee <br />1.60 <br />g/cc <br />Detonation Velocity <br />22,000 <br />ft/s <br />6,706 <br />m/s <br />Casing Diameter <br />10 <br />incites <br />Detonating Cord <br />Grains <br />200 <br />gr/ft <br />12.96 <br />g1ft <br />Start 20 feet <br />100' <br />Intervals Linear <br />Detonation pressure <br />180 <br />lc/bar <br />End 280 feet <br />Total energy pef ft. <br />87 <br />k/bar <br />Strength 200 grain <br />Pressure at casing <br />1.11 <br />k/bar <br />16,660 <br />psi <br />Total 260 feet <br />*These are estimated pressure for a empty well <br />150' <br />200' Site procedure <br />I. Check site and measure well depth <br />2. Clear work site of all unessential personal <br />3. Lower charges and drop pipe into the well <br />4. Pump sealing material to top of well <br />S. Check and clear blast area (sound blast warning) <br />250' 6. Arm explosives <br />7. Confirm area clear (final blast warning) <br />8. Detonate charge <br />9. Check hole and sound all clear <br />10. Refill cement to top of well to form a mushroom cap <br />300' <br />Name of Blaster Preparing Plan: Tylor McMillan <br />Total Explosives <br />7.28 lbs. 'TylOr McMillan's'lWell Service reserves the right to change or modify the charge in <br />350' any way necessary to maintain the safety of all personnel onsite and in surrounding <br />areas. <br />400' <br />450' <br />Received Time May, 9. 2018 7:21AM No,3496 <br />