Laserfiche WebLink
UST Response Plan (1717010) - 1/3 <br />UNDERGROUNDSTORAGETANK <br />RESPONSE PLAN - PAGE 1 (One forth per facility) <br />TYPE OF ACTION ❑ I. NEW PLAN 2. CHANGE OF INFORMATION R01. <br />I. FACILITY INFORMATION <br />FACILITY ID fl (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY_Np,4ME) Roz. <br />Parc�o QA f�l`C l W <br />BUSINESS SITE ADDRESS Rol <br />CITY R04. <br />(r ori- kja <br />S o 9 <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material fmm the UST system. <br />➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds <br />that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not necessarily display <br />rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment: <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete n1v if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />R10, <br />1 R20. <br />Q IL Y-'QIQ <br />Ran. <br />R11. <br />R21. <br />R31. <br />R12. <br />R22. <br />R32. <br />R13. <br />R23, <br />R33. <br />RIA, <br />RNA <br />R34. <br />R15. <br />R2S <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />N Rao. <br />TITLE R50. <br />/V <br />0rr_- ( Qi, <br />NAM)R41. <br />uan ��oy�re5 <br />TITLE R51. <br />V�4 u� <br />NAMERae. <br />Jas Jux do <br />TITLE Rsx. <br />9wl nand rM moi` <br />NAME Ras. <br />TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE U ORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />❑ Additional system testing or data collection Inspection by qualified persons ❑ Recalibration of equipment <br />Other: <br />R60. <br />UST Response Plan (1717010) - 1/3 <br />