My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4455
>
1900 - Hazardous Materials Program
>
PR0520990
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 4:00:54 PM
Creation date
8/7/2018 10:46:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520990
PE
1919
FACILITY_ID
FA0002469
FACILITY_NAME
KFC CORBIN 255
STREET_NUMBER
4455
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207-7601
CURRENT_STATUS
01
SITE_LOCATION
4455 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN <br />SPILL CONTROL PROCEDURES SECTION <br />SPILL CONTROL LEADER (12) <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />SIDE 2 <br />JAN 16 2001 <br />THE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />SAN JOAQUIN COUNTY <br />C� _T m2"— OMM OF EMERGENCY SERVICES <br />AUTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the,action(s) indicated below to control spills of hazardous materials on its <br />property. Persons performing these tasks will possess written procedures for performing them and will have received training on the <br />procedures and equipment needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br />minimum our business must isolate the area of the spill and make notifications. <br />Spills of Liquid Materials <br />❑ Plug and Patch Container <br />❑ Build Retention Dike <br />❑ Remove Sources of Ignition <br />❑ Position Container so as to Stop Leak <br />❑ Reduce Pressure in Container/System <br />❑ Isolate Area and Make Notifications <br />7SRelaof Compressed Gases <br />hut Off Valves/Systems <br />ElVeRtilate Area of Release <br />Reduce Pressure in Container/System <br />❑ Suppress Vapors with Water <br />Isolate Area and Make Notifications <br />❑ Remove Sources of Ignition <br />❑ Neutralize Spilled Material <br />�, Secure System Valves and Closures <br />[q"'Shutdown System Involved <br />❑ Apply Absorbent Material to Spill Area <br />Spills of Solid or Powder Materials <br />❑ Cover Spill to Prevent Spread <br />❑ Neutralize Spilled Materials <br />❑ Position Container so as to Stop Leak <br />❑07 <br />Place Spilled Material into Drum or Bag <br />Isolate Area and Make Notification <br />AUTHORIZED CLEANUP COMPANIES SECTION (15) <br />The following cleanup companies will be accessed in the event that our business must expend funds to clean up a hazardous <br />materials spill. <br />_2n sq�s <br />NAME 24-HOUR TELEPHONE NO. <br />NAME <br />24-HOUR TELEPHONE NO <br />AGREEMENT/CONTRACT NO. <br />AGREEMENT/CONTRACT NO. <br />SJC 12/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.