Laserfiche WebLink
Steven Shih [EH] <br />From: Matt Moyneur <mmoyneur@wallace-kuhl.com> <br />Sent: Tuesday, January 16, 2018 3:29 PM <br />To: Steven Shih [EH] <br />Cc: Tom Desimone <br />Subject: Permit WP0037617 Change in Drillers <br />Attachments: Approved Permits.pdf; Taber Well Permit 1-16-18.pdf <br />Hi Steven, <br />Joe Follettie in our office gave me your contact information and said you requested that if we wanted to change drilling <br />contractors for permit WP0037617, that we should fill out Page 1 of the permit application and provide the Licensed <br />Contractors Declaration form. <br />I have appended both forms, as well as the original permit that was approved. <br />We are tentatively scheduled to drill on Thursday, January 18, 2018 and Friday, January 19, 2018, assuming the USA <br />clearance is completed by then. <br />Please reply to let me know you received the new information and I will call in to schedule the inspection once we get <br />confirmation from the drilling contactor that we will be on site on Thursday and Friday. Thanks <br />Matt Moyneur, MS, PE, GE <br />Senior Engineer <br />mmoyneur(a)wallace-kuhl.com <br />916-372-1434 phone 1916-870-8834 cell <br />3050 Industrial Blvd., West Sacramento, CA 95691 <br />www.wallace-kuhl.com <br />Geotechnical Engineering i Environmental & Ecological Services I Engineering Geology I Earthwork and Construction <br />Materials Testing and Inspection i Construction Materials Laboratory <br />This email message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any <br />unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by <br />reply email and destroy all copies of the original message. <br />