Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> • ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax.(209)468-3433 Web:www.sigov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> FFiamhe Swift Transportation Facility 901 D'arc Parkwa Date: ton 5/19/2010 <br /> Address: y y Date: <br /> Facility John Breuss Title: Service Manager Phone: 209 858 7073 <br /> Contact: <br /> AST New Used Gear Total Facility Shell 32,470 <br /> Diesel Diesel Diesel Diesel <br /> Content _ _ Oil Oil SII __ Capacity <br /> shell 10,000 10,000 10,000 1,000 1,000 305 165 SPCC Plan 5 year <br /> Capacity review date: <br /> SPCC Plan type: ❑APSA SPCC conditionally exempt(HSC 25270.4.5(b)) ® Fully or partially Professional Engineer certified ❑Self-Certified <br /> Inspection Type: ®Routine ❑Follow up ❑Complaint-ID#: <br /> (Authority HSC 25270.4) <br /> Consent for: ®Inspection ®Sampling ® Photos Granted by: John BreusS Title: Service Manager <br /> VIOLATIONS <br /> R HSC=CA Health and SafetyCode;CFR=Code of Federal Regulations;V=Violation;RV=Repeat violation <br /> q V v Code Section Specific requirements of HSC 25270.4.5(a)are identified as CFR code sections beginninn with 112 <br /> 1 HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br /> 2 x HSC 25270.4.5(a) Failed to conduct periodic inspections of the storage tank to assure compliance with CFR Part 112 <br /> 3 HSC 25270.6(a) Failed to file business plan or annual tank facility statement if capacity>10K gallons and 25%petroleum <br /> 4 HSC 25270.6(b) Failed to submit APSA fees <br /> 5 HSC 25270.8 Failed to report spills or releases of 42 gallons or more <br /> 6 CFR 112.3(d) SPCC Plan certification by a Professional Engineer(PE)missing or incomplete <br /> 7 CFR 112.3(e) Failed to retain a copy of the SPCC Plan on site <br /> 8 CFR 112.5(a) Failed to amend SPCC Plan within 6 months,or implement changes within 6 months of amendment when <br /> there is an applicable change to the facility <br /> 9 CFR 112.5(b) Failed to amend SPCC Plan within 6 months,or implement changes within 6 months of amendment after <br /> scheduled 5 year Plan review <br /> 10 x CFR 112.5(b) Failed to complete a review and evaluation of SPCC plan at least once every 5 years <br /> 11 CFR 112.5(c) Failed to have a PE certify technical amendments within 6 months of change <br /> 12 CFR 112.6 Failed to self-certify technical amendment when there is an applicable change to the:(a)(2)Tier I qualified <br /> facility;orb 2 Tier II qualified facility <br /> 13 CFR 112.6(a)(3) Tier I qualified facility SPCC Plan incomplete <br /> 14 CFR 112.6(b)(1) Tier II qualified facility SPCC Plan self certification missing or incomplete <br /> 15 CFR 112.6(b)(4) Failed to provide written PE certification in a self-certified plan for alternate methods which provide <br /> environmental equivalence, or provisions in lieu of secondary containment due to impracticality <br /> 16 CFR 112.7 SPCC Plan lacks full approval of management at a level of authority to commit the necessary resources to <br /> implement the Plan <br /> 17 CFR 112.7(a)(2) Failed to provide equivalent environmental protection and/or state the reasons for nonconformance and <br /> describe the alternate methods and how they achieve equivalent environmental protection <br /> 18 CFR 112.7(a)(3) No facility diagram or diagram failed to show location and contents of each container,transfer stations,and <br /> connecting s. <br /> 19 CFR 112.7(a)(3)(i) SPCC Plan failed to include description of product type and storage capacity for each container <br /> 20 CFR 112.7(a)(3)(ii) SPCC Plan failed to include procedures for routine handling of products and discharge prevention <br /> measures <br /> 21 CFR 112.7(a)(3)(iii) SPCC Plan failed to show discharge or drainage controls(secondary containment),equipment,and <br /> procedures for the control of a discharge <br /> 22 CFR 112.7(a)(3)(iv) SPCC Plan failed to show countermeasures for discovery, response and cleanup of discharges <br /> 23 CFR 112.7(a)(3)(v) SPCC Plan failed to address disposal methods for recovered materials <br /> 24 CFR 112.7(a)(3)(vi) SPCC Plan failed to include required contact list and phone numbers of the facility's response coordinator, <br /> cleanup contractors,and agencies to notify in case of discharge <br /> 25 CFR 112.7(a)(4) Failed to provide information and procedures to enable a person to adequately report discharges if a <br /> response plan was not submitted to the Regional Administrator RA <br /> 26 CFR 112.7(a)(5) Failed to organize emergency procedures for discharges in a readily useable way if a response plan was <br /> not submitted to the RA <br /> Inapecto Michelle Hanry Phone: Received By: Title: <br /> (209)953-7699 <br /> .Fri— <br /> Rev 2/18/10 Page 1 APSA INSPECTION REPORT <br />