Laserfiche WebLink
San Joaquin County AMENDED <br /> Environmental Health Department 3 <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:www.s4gov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> FARMINGTON CIRCLE K 209 886-5758 February 16 2016 <br /> Facility Address: CERS ID: <br /> 4469 S ESCALON BELLOTA BLVD, FARMINGTON CA 95230 10187403 <br /> Inspection Contact: Title: Phone: <br /> Kuldeep Singh Manager 209 607-9229 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION - Operating Permit 12832 -ASTFAC 10 K- </=100 K GAL CUMULATIVE <br /> Consent For: I Consent Given By: <br /> X Inspection Z Photos M Samples I Kuldeep Singh, Manager <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 V ❑R ❑COS <br /> 102 HSC 25270.4.5(a) Failed to properly close a tank that is considered permanently closed ❑V ❑R ❑COS <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons ❑V ❑R n COS <br /> 104 HSC 25270.6(b) Failed to submit APSA fees ❑V ❑R ❑COS <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V ❑R ❑COS <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report ❑V ❑R ❑COS <br /> 107 HSC 25404(e)(4) Failed to report program data electronically ❑V ❑R o COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete ■V ❑R ❑COS <br /> 202 CFR 112.3(e)(1) Failed to maintain a copy of the Plan on site n V ❑R ❑COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 1125(a) Failed to amend Plan as necessary V R COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments ■V R COS <br /> 303 CFR 112.5(,) Failed to have a PE certify technical amendments ❑V ❑R COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan ❑V ❑R ❑COS <br /> 603 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection, if applicable ❑V ❑R ❑COS <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers,transfer stations,and pipes ■V ❑R ❑COS <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout,operations discharge prevention methods and containers ■V ❑R ❑COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge ❑V ❑R o COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ❑V ❑R ❑COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ■V ❑R ❑COS <br /> 609 CFR 112.7(,) Failed to provide secondary containment,diversionary structures,or equipment to prevent discharge ❑V ❑R ❑COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability ❑V ❑R ❑COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response plan submitted ❑V ❑R ❑COS <br /> 612 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> 613 CFR 112.7(e) Failed to conduct inspections or maintain records for 3 years ■V ❑R o COS <br /> Page 1 of 8 — <br /> 9171 9690 0935 0087 3051 70 <br />