My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4469
>
2800 - Aboveground Petroleum Storage Program
>
PR0540158
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:10:23 PM
Creation date
8/24/2018 6:19:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540158
PE
2832
FACILITY_ID
FA0019881
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4469
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713010
CURRENT_STATUS
01
SITE_LOCATION
4469 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON BELLOTA\4469\PR0540158\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/14/2016 10:50:47 PM
QuestysRecordID
3022137
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for FARMINGTON CIRCLE K as of March 17, 2017. <br /> Open violations from February 16, 2016 inspection <br /> Violation #714-Failed to provide each container with a high level monitoring device. <br /> The 55 gallon drum of fuel contaminated water was not equipped with a liquid level sensing device. At least one of 0 <br /> following devices must be installed in each container: <br /> - High liquid level alarm with audible or visual signal <br /> -High liquid level pump cutoff device set to stop flow at a predetermined content level <br /> - Direct audible or code signal communication between the container gauger and the pumping station <br /> - Fast response system, such as digital computer, telepulse, or direct vision gauge. If a direct vision gauge is <br /> being used for determining the liquid level of each tank, a person must be present to monitor gauges and the overall <br /> filling of the tanks. <br /> Immediately install an approved liquid level sensing device in accordance with CFR 112.8 and implement necessary <br /> procedures to ensure that the devices are fully functional and in use at all times during tank filling operations, or <br /> provide equivalence as allowed by CFR 112.7(a)(2). <br /> Violation#715- Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> Liquid level sensing devices have not been tested for the four aboveground tanks on site Procedures and frequency <br /> of testing for these devices were not addressed in the Spill Prevention, Control, and Countermeasure (SPCC) plan. <br /> Liquid level sensing devices must be installed in accordance with CFR 112.8 and shall be regularly tested to ensure <br /> proper operation. Immediately conduct all necessary testing of liquid level sensing devices, or provide equivalence <br /> as allowed by CFR 112.7(a)(2). <br /> Violation#718 -Failed to provide sufficient secondary containment capacity for mobile or portable <br /> containers. <br /> The black steel 55 gallon drum of fuel contaminated test waters was observed with no secondary containment. <br /> Portable oil storage containers must be positioned or located to prevent a discharge and shall be furnished with a <br /> secondary means of containment sufficient to contain the capacity of the largest single container with sufficient <br /> freeboard to contain precipitation. Immediately provide sufficient secondary containment for this and all other <br /> portable containers at this facility, or provide equivalence as allowed by CFR 112.7(a)(2). <br /> Violation#719 -Failed to locate mobile or portable containers to prevent discharge. <br /> The black steel 55 gallon drum of fuel contaminated test water was not located to prevent a discharge. Portable oil <br /> storage containers must be positioned or located to prevent a discharge and shall be furnished with a secondary <br /> means of containment sufficient to contain the capacity of the largest single container with sufficient freeboard to <br /> contain precipitation. Immediately relocate these and all other portable containers at this facility to prevent a <br /> discharge. <br /> Violation #724 - Failed to regularly inspect aboveground valves, piping, and appurtenances. <br /> No inspection records were found for aboveground valves, piping and appurtenances. All aboveground valves, <br /> piping, and appurtenances shall be regularly inspected. Immediately inspect aboveground valves, piping, and <br /> appurtenances and ensure inspections are done regularly, or provide equivalence as allowed by CFR 112.7(a). <br /> Violation #725 - Failed to conduct integrity and leak test on buried piping any time it is worked on. <br /> No integrity test results were found on site for buried piping. Buried piping shall be tested for integrity and leaks at <br /> the time of installation, modification, construction, relocation, or replacement. Immediately perform integrity and leak <br /> testing of this piping and ensure that piping is tested when required, or provide equivalence as allowed by CFR <br /> 112.7(a)(2). <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.