Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> General Inspection Information: <br /> Inspection Date: U IIH- 6 I `�',0 1 Retain Until Date: (36 months from inspection date) <br /> Prior Inspection Date: J A-6_ a O) g Inspector Name: 1 41,L I� jaip S)k j& <br /> Tanks Inspected(ID N's): <br /> Inspection Guidance: <br /> Por equipment not included in this Standard. follow the manufacturer recommended inspection/testing schedules and procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector. • <br /> It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Remove promptly upon discovery standing water or liquid in the primary tank.secondary containment area. interstice,or spill container. Before discharge to the environment. f <br /> inspect the liquid for regulated products or other contaminants and disposed of it properly. F <br /> 'r In order to comply with EPA SPCC(Spill Prevention.Control and Countermeasure)rules.a facility must regularly test liquid level sensing devices to ensure proper operation <br /> (40 CFR I I2.8(c)(8)(v)). <br /> i (•)designates an item in a non-confomtance status.*1 his indicates that action is required to address a problem. <br /> 1 Non-conforming items important to tank or containment integre require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank manufacturer <br /> who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> S- Retain the completed checklists for 36 months. <br /> Y Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note: U2 change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current plan <br /> requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> -as. Status Comments <br /> 1.0 Tank Containment <br /> Yes' N 'N/A � �1 <br /> sr".:;:r r•�I�: �:at>. .,r No HohQ , I:5 -a- Ga-��.1�5 �I n covlleul- ^a� <br /> Na <br /> ,.,nr]2�raea[.cn �riU aU -"1UV) t'J� 1.1 vie-'Y M/\ <br /> a�age <br /> - <br /> ' <br /> 2.0 Tank Foundation and Supports <br /> Yes- 6P N/A <br /> O'r woman <br /> 23 <br /> I <br />