Laserfiche WebLink
STI SP001 Portable Container Monthly Inspection Checklist <br /> General Inspection Information: <br /> Inspection Date: MAY Y Retain Until Date: (36 months from inspection date) <br /> prior Inspection <br /> Date: - -`�-'—�-- Inspector Name: 6, <br /> Containers Inspected(ID X's): <br /> Inspection Guidance: <br /> Y For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> Y The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified Inspector. • <br /> It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Y (•)designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> Y Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank manufacturer <br /> who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. r <br /> ➢ Retain the completed checklists for 36 months. <br /> :tem Area: Area: Arca: Area: <br /> 1.0 AST Containment/Storage Area <br /> !.: ASTs wi.hin designatec Yes o Yes :No* Yes No* Yes ;No* <br /> storage area? <br /> 1.2 Debris.spills,or other fire Yes* o Yes* No Yes* No Yes* 'No <br /> hazards in containment or <br /> storage area? <br /> .3 water iri outdoor Yes" o Yes* No Yes* No Yes* No <br /> secondary contamment? <br /> i 4 Drain valves operablee ' INo• Yes* No 'Yes* : 'No Yes* .-No • <br /> and in a closed <br /> pos tion? <br /> : S Egress pathways clear es !No• Yes* 'No Yes* No Yes* INo <br /> and gates/coor< <br /> operable? <br /> 29 <br />