Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> TYPE OF ACTION O L NEW PLAN ,9 2.CHANGE OF INFORMATION Rot. <br /> I. FACILITY INFORMATION <br /> FACILITY ID d (Agency Use Only) <br /> BU ESS NAME(Same as FACILITY NA R0z <br /> �vn Cp r az <br /> BUSINESS SITE ADDRESS R03. I CITY R03. <br /> 10ZZt,. <br /> 1I. SPL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-oft,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> • Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> • Absorbent material will be used in contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a property labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material,If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc,will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product'waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This - <br /> equipment is inspected at least monthly,and atter each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. _ <br /> E UIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IF NEEDED: (Complete onl ifapplicable) <br /> EQUIPMENT ag <br /> AVAILABELITY <br /> R2A. R30. <br /> Rat. <br /> R22If3i. <br /> M3. <br /> R24. <br /> R36. <br /> R15. R25. <br /> R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> N=INDICAT7ES <br /> Rao. <br /> _� D���\X&� TITLE CYRMo. <br /> NW �'"x41. TITLERs t. <br /> NRoz TITLE <br /> R52. <br /> NR43. TITLER53. <br /> V. MONITORING INDICATORS <br /> IFTES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> $ or dam collection )71nspectionbyqualifiedpersons A Recalibration of equipment <br /> Other: <br /> ReO. <br /> UST Response Plan(3/2008)-I!3 <br />