My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California95205-6232 <br /> Telephone: (209) 468-3420 Fax., (209)468-3433 Web:www.siaoy.ofa/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> GEMCO RIPON TRUCK PLAZA INC 209 599-5900 March 17 2016 <br /> Facility Address: CERS ID: <br /> 10 ,E RD RIPON CA 95366 10180637 <br /> Inspection ContaCP , Title: Phone: <br /> 1*=- - ph Jwner's son �lr 209 458-7474 <br /> Inspection Type: f Program: . <br /> ROUTi,- 6PECTION- Opera, 2832 - AST FAC 10 K- </_100 K GAL CUMULATIVE <br /> Consent For: Consent Given By: <br /> O Ins ection ; Photos x Samples I Harlprit Johal Owner's son <br /> CCR=California Code of Regulations HSG=Heath and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on she during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 o V ❑R o COS <br /> 102 HSC 25270.4.5(a) Failed to property close a tank that is considered permanently closed o V o R o COS <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons ❑V ❑R ❑COS <br /> 104 HSC 25270.6(b) Failed to submit APSA fees o V o R o COS <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V ❑R ❑COS <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report ■V o R ❑COS <br /> 107 HSC 25404(.)(4) j Failed to report program data electronically ❑V ❑R ❑COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete o V ❑R ❑COS <br /> 202 CFR 112.3(.)(1) Failed to maintain a copy of the Plan on site o V OR O COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary o V ❑R ❑COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments o V OR ❑COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments ❑V OR ❑COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section ■V ■R ❑COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan o V a R o COS <br /> 603 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable o V OR ❑COS <br /> 604 CFR 112.7(a)(3) No facility diagram or didn'tshow location and contents of containers,transfer stations,and pipes o V ❑R ❑COS <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout,operations discharge prevention methods and containers .V ■R a COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge n V ❑R ❑COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan o V ❑R o COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V o R ❑COS <br /> 609 CFR 112.7(c) Failed to provide secondary containment,diversionary structures,orequipment to prevent discharge ■V ■R o COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability o V ❑R a COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response plan submitted ❑V ❑R o COS <br /> 612 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R u COS <br /> 613 CFR 112.7(e) Failed to conduct inspections or maintain records for 3 years ■V ■R ❑COS <br /> Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.