My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, Califomia95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web.,www.sigov.org/etid <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> GEMCO RIPON TRUCK PLAZA INC 1 1022 E FR(7' 7 RID RIPON 1 17. 2016 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 724 CFR 112.8(d)(2) Failed to cep/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on in V ❑R o COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R in COS <br /> 4020 See below Unlisted Training violation n V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS 1,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 3-18-1tjjand an inspection report was issued identifying information to be submitted to <br /> bring this site into compliance. This information was required to be submitted by 30 days from receipt of the <br /> inspection report. This information has not been received resulting in a non-compliant status for this facility. An <br /> operator that receives an inspection report shall have 30 days to submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. A corrective action <br /> statement was provided for all the outstanding violations at the time of inspection. Not all of the violations could be <br /> addressed by the provided corrective action statement. Ensure that a written response documenting corrective actions <br /> taken or proposed is submitted within 30 days of receiving an inspection report. <br /> This is a Class II violation. <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure (SPCC) Plan does not follow the order or requirements in 40 CFR <br /> Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 for the <br /> Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include a cross-reference <br /> or to follow the required sequence. <br /> This is a repeat violation, Class It. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.