Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone. (209)468-3420 Fax: (209)468-3433 Web:w6 .sigov org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ROD DEMENT 1725 S HOLT RD STOCKTON October 12 2015 <br /> General Requirements for SPCC Plans <br /> 613 CFR 112.7(e) Failed to conduct inspections or maintain records for 3 years ❑V ❑R ❑COS <br /> 614 CFR 112.7(f)(1) Failed to train personnel on discharge prevention ❑V ❑R ❑COS <br /> 615 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention ❑V ❑R ❑COS <br /> 616 CFR 112.7(f)(3) Failed to schedule and conduct discharge prevention briefings at least annually ❑V ❑R ❑COS <br /> 617 CFR 112.7(g) Plan failed to address security of site and valves, lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 618 CFR 112.7(h)(1) Loading/unloading rack containment system not properly sized o V ❑R ❑COS <br /> 619 CFR 112.7(h)(2) Failed to provide vehicular departure system loading and unloading racks ❑V ❑R ❑COS <br /> 620 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles ❑V ❑R ❑COS <br /> 621 CFR 112.7(i) Failed to evaluate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 622 CFR 112.7() Failed to include discussion of conformance to discharge prevention and containment procedures ❑V ❑R ❑COS <br /> SPCC Plan Requirements for Onshore Facilities (excludinI.g`production facilities) <br /> 701 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas ❑V ❑R ❑COS <br /> 702 CFR 112.8(b)(3), Failed to design facility drainage system from undiked areas to retain in the facility ❑V ❑R ❑COS <br /> 112.8(b)(4) <br /> 703 CFR 112.8(b)(5) Failed to provide two lift pumps for more than one continuous treatment unit ❑V in R ❑COS <br /> 704 CFR 112.8(c)(2) Diked area is not sufficiently impervious to contain discharged oil ❑V ❑R ❑COS <br /> 705 CFR 112.8(c)(1) Container not compatible with oil stored and/or storage conditions ❑V ❑R ❑COS <br /> 706 CFR 112.6(c)(2) Failed to provide and maintain adequate secondary containment ❑V ❑R ❑COS <br /> 707 CFR 112.8(c)(3)(i) Failed to keep containment bypass valves closed when not draining rainwater ❑V ❑R ❑COS <br /> 708 CFR 112.8(c)(3)(ii) Failed to inspect retained rainwater prior to discharge ❑V ❑R ❑COS <br /> 709 CFR 112.8(c)(3)(iii) Failed to open and close bypass valve to drain rainwater under responsible supervision ❑V ❑R ❑COS <br /> 710 CFR 112.8(c)(3)(iv) Failed to maintain records of drainage from diked areas ❑V ❑R ❑COS <br /> 711 CFR 112.8(c)(5) Failed to provide corrosion protection for partially buried tanks ❑V ❑R ❑COS <br /> 712 CFR 112.8(c)(6) Failed to perform tank inspections that take into account size,configuration,and design ❑V ❑R ❑COS <br /> 713 CFR 112.8(c)(6) Failed to perform scheduled tank tests and inspections by appropriately qualified personnel ❑V ❑R o COS <br /> 714 CFR 112.8(c)(6) Failed to test and inspect containers by appropriately qualified personnel after material repairs ❑V ❑R ❑COS <br /> 715 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils ❑V in R ❑COS <br /> 716 CFR 112.8(c)(8)(i-iv) Failed to provide each container with a high level monitoring device ❑V ❑R ❑COS <br /> 717 CFR 112.8(c)(8)(v) Failed to regularly test liquid level sensing devices to ensure proper operation ❑V ❑R ❑COS <br /> 718 CFR 112.8(c)(9) Failed to observe effluent treatment frequently enough to detect potential discharge ❑V ❑R ❑COS <br /> 719 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas ❑V ❑R ❑COS <br /> 720 CFR 112.8(c)(11) Failed to provide sufficient secondary containment capacity for mobile or portable containers ❑V ❑R ❑COS <br /> 721 CFR 112.8(c)(11) Failed to locate mobile or portable containers to prevent discharge ❑V ❑R ❑COS <br /> 722 CFR 112.8(d)(1) Failed to take corrective action on buried piping when exposed for any reason ❑V ❑R ❑COS <br /> Received by Inspector: Phone: Date: <br /> (initial): �-+ l> MUNIAPPA NAIDU, Lead Senior REHS (209)468-3439 10/12/2015 <br /> Page 2 of 3 <br />