My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2800 - Aboveground Petroleum Storage Program
>
PR0528459
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:27 PM
Creation date
8/24/2018 6:53:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528459
PE
2832
FACILITY_ID
FA0010217
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\19501\PR0528459\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
8/15/2018 6:45:14 PM
QuestysRecordID
3963189
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 11 �OAOI I Environmental Health Department <br /> ■=ICOUNITY <br /> Greamess grows hei_ <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> CALIFORNIA FREIGHT (209)599-5000 October 17, 2018 <br /> Facility Address: CERS ID: <br /> 19501 N HWY 99,ACAMPO, CA 95220 10183329 <br /> Inspection Contact: Title: Phone: <br /> Paul Hamilton DIRECTOR OF TRANSPORTATIO (209)599-5000 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION-Operating Permit 12832-ASTFAC 10 K-</=100 K GAL CUMULATIVE <br /> Consent For: Consent Given By: <br /> ❑x Ins ection ❑x Photos ❑ Sam les I Joe Azevedo, Dispatcher <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Title 40 Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.6(b) Failed to pay APSA program annual fees ❑V ❑R ❑COS <br /> 102 HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 ■V ❑R ❑COS <br /> 103 HSC 25270.6(a) Failed to file HMBP or annual facility tank statement ❑V ❑R ❑COS <br /> 104 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V ❑R ❑COS <br /> 105 CFR 112.1(b)(3),112.2 Failure to properly close tanks when making a claim of permanently closed ■V ❑R ❑COS <br /> 106 HSC 25404.1.2 Failed to submit a certification and written response within 30 days for minor violations ❑V ❑R ❑COS <br /> 107 HSC 25270.2(a)(4) Failure to prepare SPCC plan when facility no longer meets oil-filled electrical equipment exclusion ❑V ❑R ❑COS <br /> 108 HSC 25270.4.5(a) Failure of conditionally exempt facility to conduct inspections or install secondary containment ❑V ❑R ❑COS <br /> 109 HSC 25270.2(o)(1)(C) Failure to have secondary containment and/or leak detection if TIUGA piping cannot be viewed ❑V ❑R ❑COS <br /> (iv)(I I I) <br /> 110 HSC 25404(e)(4) Failed to report program data in the California Environmental Reporting System(CERS) ❑V ❑R ❑COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Failure to have a licensed PE properly review and certify the SPCC plan ❑V ❑R ❑COS <br /> 202 CFR 112.3(e)(1) Failed to maintain a copy of the Plan on site ❑V ❑R ❑COS <br /> 203 CFR 112.3 Failure to implement the SPCC Plan ❑V ❑R ❑COS <br /> 204 CFR 112.3(g) Failure to prepare SPCC Plan when facility no longer meets Qualified Facility criteria ❑V ❑R ❑COS <br /> 205 CFR 112.3,112.6 Failure to prepare SPCC Plan that meets all applicable requirements ❑V ❑R ❑COS <br /> 206 CFR 112.3(d)(1) Failure of owner to assure that the PE makes all required attestations in the Plan ❑V ❑R ❑COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary ❑V ❑R ❑COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments ❑V ❑R ❑COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments ❑V ❑R ❑COS <br /> 304 CFR 112.5(a),112.5(b) Failure to implement SPCC plan amendments within 6 months LiV ❑R ❑COS <br /> Qualified Facility-Tier 1 <br /> 401 CFR 112.6(a),112.6(b) Tier I Qualified Facility Plan not certified by the owner or a PE ❑V ❑R ❑COS <br /> 402 CFR 112.6(a)(2) Owner of Tier I Qualified Facility failed to self certify technical amendment ❑V ❑R ❑COS <br /> 403 CFR 112.6(a)(3)(i) Plan failed to predict direction/rate of flow/total quantity of oil potentially discharged ❑V ❑R ❑COS <br /> 404 CFR 112.6(a)(3)(ii) No 2CT for bulk containers,or mobile storage containers not located to prevent discharge ❑V ❑R ❑COS <br /> FA0010217 PRO528459 SCO01 10/17/2018 <br /> EHD 28-01 Rev.09/27/2018 Page 1 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.