Laserfiche WebLink
SAN J 0 A Q U I N Environmental Health Department <br /> J O U N T Y _ AMENDED <br /> 16 � O !p_u <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name : TFacility Address : Date : <br /> CALIFORNIA FREIGHT 19501 N HWY 99 , ACAMPO October 17 , 2018 <br /> Qualified Facility - Tier I <br /> 405 CFR 112 . 6(a)(3) (iii) Overfill prevention for containers not provided , not described in Plan , or tested ❑ V ❑ R ❑ COS <br /> Qualified Facility - Tier II <br /> 501 CFR 112 . 6(a) ( 1 ) , Tier II Qualified Facility Plan not certified by the owner or a PE , as required ❑ V ❑ R ❑ COS <br /> 112. 6(b) <br /> 502 CFR 112 . 6(b) (2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE ❑ V ❑ R ❑ COS <br /> 503 CFR 112. 6(b)(3) , Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility ❑ V ❑ R ❑ COS <br /> 112. 6(b)(4) <br /> 504 CFR 112 . 6(b) (4)(i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑ V ❑ R ❑ COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112 . 7 Failure of Plan to fulfill basic requirements including a cross-referencing section ❑ V ❑ R ❑ COS <br /> 602 CFR 112 .7(a)(2) Plan failed to discuss equivalent environmental protection , if applicable ❑ V ❑ R ❑ COS <br /> 603 CFR 112 . 7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan ❑ V ❑ R ❑ COS <br /> 604 CFR 112 . 7(a)(3) (i) Plan failed to include oil type and storage capacity for each container ❑ V ❑ R ❑ COS <br /> 605 CFR 112 . 7(a)(3) (ii) Plan failed to adequately discuss discharge prevention measures, including routine handling ❑ V ❑ R ❑ COS <br /> 606 CFR 112 . 7(a)(3) (iii) Plan failed to adequately discuss facility drainage or drainage controls ❑ V ❑ R ❑ COS <br /> 607 CFR 112 . 7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery, response and cleanup ❑ V ❑ R ❑ COS <br /> 608 CFR 112 . 7(a) (3)(v) Plan failed to address disposal methods for recovered materials ❑ V ❑ R ❑ COS <br /> 609 CFR 112.7(a)(3vi) , Plan failed to adequately contain procedures for reporting a discharge ❑ V ❑ R ❑ COS <br /> 112. 7(a4) <br /> 610 CFR 112.7(a) (5) Discharge procedures are not adequately addressed if the facility has no response plan ❑ V ❑ R ❑ COS <br /> 611 CFR 112 .7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑ V ❑ R ❑ COS <br /> 612 CFR 112 .7(c) Plan failed to include secondary containment, diversionary structures , or equip to prevent discharge ❑ V ❑ R ❑ COS <br /> 613 CFR 112 . 7(c) Failure to provide appropriate secondary containment, diversionary structures or equipment ❑ V ❑ R ❑ COS <br /> 614 CFR 112 . 7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures ❑ V ❑ R ❑ COS <br /> 615 CFR 112 . 7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability ❑ V ❑ R ❑ COS <br /> 616 CFR 112 . 7(d)(1 ) Failure to prepare an oil spill contingency plan when claiming impracticability of structures ❑ V ❑ R ❑ COS <br /> 617 CFR 112.7(d) (2) No written commitment of manpower, equipment, and materials to control and remove oil discharge ❑ V ❑ R ❑ COS <br /> 618 CFR 112.7(e) , 112.8(c) Failed to keep records of procedures, inspections, or integrity tests for three years ❑ V ❑ R ❑ COS <br /> (6) <br /> 619 CFR 112 .7(f) (1 ) Failed to train personnel on all discharge prevention details listed in this section ❑ V ❑ R ❑ COS <br /> 620 CFR 112.7(f) (2) Failed to designate a person accountable for discharge prevention ❑ V ❑ R ❑ COS <br /> 621 CFR 112.7(f) (1 ) Failure to include in the SPCC Plan an adequate description of employee training ❑ V ❑ R ❑ COS <br /> 622 CFR 112 .7(%3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel ❑ V ❑ R ❑ COS <br /> 623 CFR 112 . 7(g) Plan failed to address security of site and valves , lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 624 CFR 112 . 7(g) Facility failed to implement security of site and valves, lock out/tag out, and lighting ❑ V ❑ R ❑ COS <br /> 625 CFR 112 . 7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack ❑ V ❑ R ❑ COS <br /> 626 CFR 112 .7(h)( 1 ) Loading/unloading rack containment system not adequate to contain spill ❑ V ❑ R ❑ COS <br /> FA0010217 PRO528459 SCO01 10/17/2018 <br /> EHD 28-01 Rev. 09/27/2018 Page 2 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E . Hazelton Avenue Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjcehd . com <br />