My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2800 - Aboveground Petroleum Storage Program
>
PR0523352
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 12:59:27 PM
Creation date
8/24/2018 7:17:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523352
PE
2832
FACILITY_ID
FA0010216
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19820001
CURRENT_STATUS
01
SITE_LOCATION
1000 E ROTH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PR0523352\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
1/5/2016 7:55:30 PM
QuestysRecordID
2969447
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209)468-3433 Web:www.sigov.org/ehd <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 10/15/13 <br /> Facility Address: Union Pacific-1 ntermodalFacility 1000 East Roth Rd, FrenchCamp Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I, CLASS II,or MINOR-Notice to Comply) <br /> Notes: <br /> SPCC training conducted 01/2013. <br /> Single-walled Hydraulic Oil tank in oil room replaced with double-walled w/liquid level gauge. <br /> Single-walled Motor Oil tank in oil room soon to be replaced with double-walled w/liquid level gauge. <br /> Plans for Gasoline to be converted to red-dyed diesel tank. <br /> Amend SPCC Plan within 6 months of change when there is a change in facility design, construction, <br /> operation, or maintenance that materially affects its potential discharge. Changes include, but not limited <br /> to: commissioning or decommission containers, replacement, reconstruction, or movement of <br /> containers. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECT AT ANY�TIM-�T EHD'S CURRENT HOURLY RATE. <br /> A N��14 1 1 ) _ <br /> EHD Inspector: Rec iv Title: <br /> Thuy Tran (209) 468-8257 <br /> EHD 23-02-003 Rev 04/19/12 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.