My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIKORSKY
>
5000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541901
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 4:31:54 PM
Creation date
8/24/2018 7:22:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541901
PE
2832
FACILITY_ID
FA0016555
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
5000
STREET_NAME
SIKORSKY
STREET_TYPE
St
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 Sikorsky St
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\S\SIKORSKY\5000\PR0541901\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
8/8/2018 10:56:25 PM
QuestysRecordID
3959462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cesar Ruvalcaba [EH] <br /> From: Cochran, Geoffrey <Geoffrey.Cochran@atlanticaviation.com> <br /> Sent: Wednesday, August 22, 2018 2:50 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: SPCC-Corrective Action Update <br /> Attachments: SP001 Inspection Forms.pdf, Double Wall Guage.docx; Compliance Form-SPCC.pdf <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Cesar, <br /> I have attached some files for our corrective actions and plans for getting our SPCC revised. Please see the information <br /> below and attachments. Let me know if you have any questions or anything else we can do better. <br /> Item#301— Failed to amend Plan as necessary. <br /> -1 gathered our Risk and Safety Manager Carlos along with our General Manager Travis to revise our <br /> SPCC Plan. Carlos took notes and sent the items to be revised: (2) Mobile Refuelers to be added and our 500 gallon Fuel <br /> Bowser will be added to the Plan. Carlos contacted Madison Environmental to send out an engineer to revise our Plan. <br /> We have been informed that an engineer will be here out our facility to revise the Plan some time in September. <br /> Possibly past our September 6th deadline. Hopefully this progress is acceptable for you. <br /> -In regards to our 55 gallon petroleum drums and our max of 3 drums, we have a planned schedule to <br /> have 4 drums picked up by Ramos Environmental each month (Starting this month -Aug. 30th is scheduled pick up) By <br /> October, we should have all our drums picked up and gone. I will send you a receipt of the pick up to show our progress <br /> once Ramos comes. <br /> Item#302—Failed to review Plan once every five years and/or implement any resulting amendments <br /> -As stated in Item 301, we have contacted Madison Environmental and have an upcoming date to have <br /> an engineer here at our facility to revise our new Plan. <br /> Item#701—Failure to ensure drainage from diked areas is restrained by vales or alternative method. <br /> -Corrected on site. <br /> Item#706—Failed to provide and maintain adequate secondary containment. <br /> -Please see attachment. We have placed an order for a new Double Wall Gauge. Estimated delivery <br /> time is 9/12/18. Attached is our order receipt for evaluation. <br /> Item#711-Failed to perform scheduled tank tests or inspections by appropriately qualified personnel. <br /> -SP001 have been filled out and attached. Please see attachment. <br /> Geoff Cochran <br /> SCK Line Service Manager <br /> T : 209.982.1622 <br /> M : 916.208.7580 <br /> E : geoffrey.cochran@atlanticaviation.com <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.