My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIKORSKY
>
5000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541901
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 4:31:54 PM
Creation date
8/24/2018 7:22:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541901
PE
2832
FACILITY_ID
FA0016555
FACILITY_NAME
ATLANTIC AVIATION
STREET_NUMBER
5000
STREET_NAME
SIKORSKY
STREET_TYPE
St
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 Sikorsky St
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\S\SIKORSKY\5000\PR0541901\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
8/8/2018 10:56:25 PM
QuestysRecordID
3959462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN, J O ` Q U I ` , Environmental Health Department <br /> - IJH{ II1�91 U 1N I Y II1}II <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ATLANTIC AVIATION 5000 Sikorsky St, STOCKTON August 07, 2018 <br /> Qualified Facility-Tier II <br /> 501 CFR 112.6(a)(1), Tier II Qualified Facility Plan not certified by the owner or a PE,as required ❑V ❑R ❑COS <br /> 112.6(b) <br /> 502 CFR 112.6(b)(2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE ❑V ❑R ❑COS <br /> 503 CFR 112.6(b)(3), Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility ❑V ❑R ❑COS <br /> 112.6(b)(4) <br /> 504 CFR 112.6(b)(4)(i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑V ❑R ❑COS <br /> low General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable ❑V ❑R ❑COS <br /> 603 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan ❑V ❑R ❑COS <br /> 604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage capacity for each container ❑V ❑R ❑COS <br /> 605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures,including routine handling ❑V ❑R ❑COS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls ❑V ❑R ❑COS <br /> 607 CFR 112.7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery,response and cleanup ❑V ❑R ❑COS <br /> 608 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials ❑V ❑R ❑COS <br /> 609 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge ❑V ❑R ❑COS <br /> 112.7(a4) <br /> 610 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ❑V ❑R ❑COS <br /> 611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V ❑R ❑COS <br /> 612 CFR 112.7(c) Plan failed to include secondary containment,diversionary structures,or equip to prevent discharge ❑V ❑R ❑COS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment ❑V ❑R ❑COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures ❑V ❑R ❑COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability ❑V ❑R ❑COS <br /> 616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures ❑V ❑R ❑COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> 618 CFR 112.7(e),112.8(c) Failed to keep records of procedures,inspections,or integrity tests for three years ❑V ❑R ❑COS <br /> (6) <br /> 619 CFR 112.7(f)(1) Failed to train personnel on all discharge prevention details listed in this section ❑V ❑R ❑COS <br /> 620 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention ❑V ❑R ❑COS <br /> 621 CFR 112.7(f)(1) Failure to include in the SPCC Plan an adequate description of employee training ❑V ❑R ❑COS <br /> 622 CFR 112.7(f)(3) Failure to conduct complete annual discharge prevention briefings for oil-handling personnel ❑V ❑R ❑COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 624 CFR 112.7(g) Facility failed to implement security of site and valves,lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack ❑V ❑R ❑COS <br /> 626 CFR 112.7(h)(1) Loading/unloading rack containment system not adequate to contain spill ❑V ❑R ❑COS <br /> 627 CFR 112.7(h)(2) Failed to provide vehicular departure system for loading and unloading racks ❑V ❑R ❑COS <br /> 628 CFR 112.7(a)(1), Failure to include in the Plan discussion of conformance with Federal and State requirements ❑V ❑R ❑COS <br /> 112.70) <br /> FA0016555 PRO541901 SCO01 08/07/2018 <br /> EHD 28-01 Rev.11/07/2017 Page 2 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.