Laserfiche WebLink
WiEbat <br /> ainay AIR LLUTI CONTROL DISTRICT <br /> TP-201.4 <br /> Dynamic Back Pressure Test Report Form <br /> Permit Number: N-6060.1-1 I CONF#:09-9 -Test Company: TANK-TEK ENVIRONMENTAL CORP. <br /> Site Name: RAMOS OIL -- Technician: MIKE LAWRENCE <br /> Site Address: 8925 W.THORNTON ROAD U—Mr—wTRUM <br /> City: THORNTON I zip: 956-86 FEB 27,2010 <br /> Date/Ti me of Test: JON is,2009 1 9:00 AM <br /> Phase ll vapor recovery system executive order(as referenced on Permit to Operate) <br /> Pressure measuring device 0 digital manometer 0 mechanical gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) MAY 1,2009 <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in, w.c. or less)' TO—, <br /> Back pressure test assembly leak check(must decay < 0.2 in w.c. in5 min. at 50%, pgsS <br /> of the scale of the assembl 's hi hest ran e <br /> 0. 2 (balance for AST& UST)&G-70-139(Hirt VCS- <br /> ..200) 0.15 @ 2.0 CFH 0.45 @ 60 CFH CFH <br /> G-70.177& 181 (Hirt VCS-400) 0.50 @ 60 CFH ti <br /> G-70,191 (Healy ORVR) L'NqNk'J <br /> ,I'MI 0.50 @ 60 CFH <br /> VR-201 &202(Healy Phase I I EVR) 1-MUMMAN 0.50 @ 60 CFH <br /> VR-203(VST balance Phase 11 EVR) A <br /> .35 @ 60 CFH <br /> 1 .2 ALL .03 .09 .16 <br /> 3.4 ALL .03 .07 .16 <br /> Ideclare, under penalty of perjury under the laws of the state of California that based on information and belief <br /> formed after reasonable inquiry, the statements and information provided in the document are true, accurate, <br /> and complete. <br /> Signature of Technician: Date: JUN 16,2009 <br /> ver: LI --05b].08 <br />