My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37350
>
2800 - Aboveground Petroleum Storage Program
>
PR0539897
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 1:10:18 PM
Creation date
8/24/2018 7:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0539897
PE
2832
FACILITY_ID
FA0011282
FACILITY_NAME
Valley Rock Quarry
STREET_NUMBER
37350
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95378
CURRENT_STATUS
01
SITE_LOCATION
37350 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\37350\PR0539897\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/9/2018 9:12:51 PM
QuestysRecordID
3849882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cesar Ruvalcaba [EH] <br /> From: Aranda, Cesar <arandac@vmcmail.com> <br /> Sent: Friday, August 10, 2018 3:19 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: Re: APSA/SPCC inspection <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Good Afternoon Cesar, <br /> Vulcan Materials is in the process of evaluating permanent closure of the above ground diesel and used oil <br /> storage tanks, and, removal of the portable asphalt oil storage tank. <br /> Vulcan respectfully requests a 30 day extension to complete the evaluation and permanent closure/removal of <br /> the tanks. Should the evaluation determine permanent closure/removal not being feasible, the SPCC will be <br /> revised in accordance with the inspection report dated July 12, 2018. <br /> Feel free to contact me should you have any questions. <br /> Thanks, <br /> Cesar <br /> Cesar Aranda, P.E. <br /> Manager, Water Resources <br /> Vulcan Materials Company/West Region <br /> 11599 Old Friant Road, Fresno, CA 93730 <br /> Direct: (559)434-1202 <br /> Cell: (559) 978-1721 <br /> On Fri, Jul 13, 2018 at 4:31 PM, Cesar Ruvalcaba [EH] <cruvalcaba(&sicehd.com> wrote: <br /> messageThis was sent securely using ZixCorp. <br /> Cesar, <br /> Here is the APSA/SPCC inspection report conducted on 07/12/2018 at the Tracy facility. I have also included <br /> the requirements for a permanently closed tank. Regarding the closure of the tanks, I have consulted with my <br /> supervisor and the Environmental Health Department would only require notification that the tanks are back in <br /> operation and CERS updated to reflect APSA as being part of the business activities. As stated in the guidance <br /> document, you may want to review the requirements of other agencies that may regulate the tanks, for <br /> example the fire district or air resources board if it is decided that the tanks will be Permanently (temporarily) <br /> closed. I have also included the guidance section for the facility diagram which included sample diagram <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.