My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1640
>
2800 - Aboveground Petroleum Storage Program
>
PR0541223
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:05:12 PM
Creation date
8/24/2018 7:42:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541223
PE
2832
FACILITY_ID
FA0014999
FACILITY_NAME
Global Materials Management, LLC
STREET_NUMBER
1640
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1640 N Broadway Ave
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\B\BROADWAY\1640\PR0541223\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
6/14/2018 3:41:59 PM
QuestysRecordID
3915887
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q lJ I N Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> Global Materials Management, LLC (818) 900-8476 August 26, 2016 <br /> Facility Address: CERS ID: <br /> 1640 N Broadway Ave, Stockton, CA 95205 10685554 <br /> Inspection Contact: Title: Phone: <br /> Jay Kandathil Owner (818) 770-2577 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION - Operating Permit �2832 -ASTFAC 10 K - </=100 K GAL CUMULATIVE <br /> Consent For: I Consent Given By: <br /> Z Inspection 0 Photos Z Samples I Jay Kandathil, Owner <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.6(b) Failed to pay APSA program annual fees ❑V ❑R ❑COS <br /> 102 HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 ■V ❑R ❑COS <br /> 103 HSC 25270.6(a) Failed to file HMBP or annual facility tank statement ❑V ❑R ❑COS <br /> 104 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V o R o COS <br /> 105 CFR 112.1(b)(3), 112.2 Failure to properly close tanks when making a claim of permanently closed ❑V o R o COS <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report o V o R L COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Failure to have a licensed PE properly review and certify the SPCC plan ❑V ❑R o COS <br /> 202 CFR 112.3(e)(1) Failed to maintain a copy of the Plan on site ❑V ❑R o COS <br /> 203 CFR 112.3 Failure to implement the SPCC Plan ❑V o R o COS <br /> 204 CFR 112.6(a)(2), Failure to prepare appropriate Plan when facility no longer meets Qualified Facility criteria ❑V ❑R ❑COS <br /> 112.6(b)(2) <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary ❑V ❑R ❑COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments ❑V in R ❑COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments ❑V ❑R ❑COS <br /> 304 CFR 112.5(a), 112.5(b) Failure to implement SPCC plan amendments within 6 months ❑V ❑R ❑COS <br /> Qualified Facility -Tier 1 <br /> 401 CFR 112.6(a), 112.6(b) Tier I Qualified Facility Plan not certified by the owner or a PE ❑V ❑R ❑COS <br /> 402 CFR 112.6(a)(2) Owner of Tier I Qualified Facility failed to self certify technical amendment o V ❑R ❑COS <br /> 403 CFR 112.6(a) Failure to have a complete Tier I Qualified Facility Plan ❑V ❑R ❑COS <br /> 404 CFR 112.6(a)(3)(ii) No 2CT for bulk containers,or mobile storage containers not located to prevent discharge ❑V o R o COS <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided, not described in Plan, or tested mV n R n COS <br /> Qualified Facility -Tier II <br /> 501 CFR 112.6(a)(1), Tier II Qualified Facility Plan not certified by the owner or a PE, as required u V L�R u COS <br /> 112.6(b) <br /> 502 CFR 112.6(b)(2) Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE ❑V ❑R ❑COS <br /> 503 CFR 112.6(b)(3), Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility ❑V o R ❑COS <br /> 112.6(b)(4) <br /> 504 CFR 112.6(b)(4)(i) Failure of owner to assure that a PE makes all required attestations in a Tier II Plan ❑V ❑R ❑COS <br /> FA0014999 PR0541223 SCo01 08/26/2016 <br /> EHD 28-01 Rev.11/07/2017 Page 1 of 7 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.