My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2800 - Aboveground Petroleum Storage Program
>
PR0528692
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 2:11:04 PM
Creation date
8/24/2018 7:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528692
PE
2832
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\C\CALIFORNIA\1800\PR0528692\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
4/28/2016 4:15:48 PM
QuestysRecordID
3023440
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1%.. <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT(APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> FacilitName: St. Joseph's Hospital Address: 1800 N California Street, Stockton Date�e" Nov 5, 2013 <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=CA Health and Safety Code;CFR=Code of Federal Regulations <br /> Cl=Class 1 violation;C2=Class 2 violation-M=Minor violation <br /> ',General Requirements oFMCP co u <br /> 509 CFR 112.7(a)(3)(v SPCC Plan failed to address disposal methods for recovered materials <br /> 510 CFR 112.7(a)(3)(vi) SPCC Plan failed to include required contact list and phone numbers of the facility's response <br /> coordinator,cleanup contractors,and agencies to notify in case of discharge <br /> 511 CFR 112.7(a)(4) Failed to provide information and procedures to enable a person to adequately report discharges if a <br /> response plan was not submitted to the Regional Administrator RA <br /> 512 CFR 112.7(a)(5) Failed to organize emergency procedures for discharges in a readily useable way if a response plan <br /> was not submitted to the RA <br /> 513 CFR 112.7(b) SPCC Plan failed to include a description of potential equipment failure(direction,Flow rate,quantity), <br /> or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 514 CFR 112.7(c) Failed to provide secondary containment and/or diversionary structures that are capable of containing <br /> —discharge from primary containment until it is cleaned u <br /> Failed to provide explanation,conduct periodic integrity testing of containers and/or periodic integrity <br /> 515 CFR 112.7(d) and leak testing for valves and piping if containment or discharge prevention structures were <br /> determined to be im racticable on an SPCC Plan or sections of one that is PE certified <br /> If a response plan was not submitted to the RA,and containment or discharge prevention structures <br /> 516 CFR 112.7(d) were determined to be impracticable,the SPCC Plan failed to provide:(1)an oil spill contingency plan; <br /> 2 written commitment of manpower,equipment,materials to control and remove oil discharge <br /> 517 X CFR 112.7(e) Failed to conduct inspections and tests in accordance with written procedures and/or maintain signed <br /> records of inspection and tests as required by the facility's SPCC Plan on site for 3 years <br /> 518 X CFR 112.7(f) Failed to:(1)train personnel on discharge prevention;(2)designate a person to be accountable for <br /> dischar a revention;or 3 schedule prevention discharge prevention briefings at least annual) <br /> Failed to describe how the oil handling,processing and storage areas are secured and controlled;how <br /> 519 CFR 112.7(g) master Flow and drain valves are secured; how unauthorized access to starter controls on oil pumps are <br /> prevented; how out-of-service and loading/unloading connections are secured;the appropriateness of <br /> security lighting;or provide equivalence as allowed by CFR 112.7(a)(2) <br /> Failed to provide sufficient secondary containment capacity for tank car or tank truck loading and <br /> 520 CFR 112.7(h)(1) unloading rack if drainage area is not designed to Flow into a catchment basin designed to handle <br /> discharges <br /> 521 CFR 112.7(h)(2) Failed to provide methods to prevent vehicles from departing loading and unloading racks before <br /> complete disconnection of transfer lines or provide equivalence as allowed by CFR 11 2.7 a 2 <br /> Failed to inspect lower-most drains and all outlets of vehicles for discharge prior to filling and departure <br /> 522 CFR 112.7(h)(3) and take appropriate measures to prevent liquid discharge while in transit or provide equivalence as <br /> allowed by CFR 112.7(a)(2) <br /> Failed to evaluate field-constructed container for risk of discharge or failure due to brittle facture or <br /> 523 CFR 112.7(i) other catastrophe after repair,alteration, reconstruction, or change in service,or provide equivalence <br /> as allowed by CFR 112.7 a 2 <br /> SPCC Plan failed to include a complete discussion of conformance to discharge prevention and <br /> 524 CFR 112.70) containment procedures as listed in part 112 and any applicable more stringent State rules,regulations, <br /> and guidelines <br /> If a response plan was not submitted to the RA,and secondary containment is not provided for qualified <br /> 525 CFR 112.7(k)(2) oil-filled equipment,the SPCC Plan failed to:(i)establish and document procedures for inspection or a <br /> monitoring program to detect equipment failure and/or discharge;(ii)provide oil spill contingency plan <br /> and/or written commitment of manpower,equipment,materials to control and remove oil discharge <br /> =� n Requirements for Onshore Facilities(excluding production facilities) <br /> 601 CFR 112.8(b)(1) Failed to prevent discharge into the drainage system from diked storage areas and/or inspect <br /> accumulation prior to drainage,or provide equivalence as allowed by CFR 11 2.7 a 2 <br /> 602 CFR 112.8(b)(2) Failed to use manual,open-and-closed design valves for the drainage of diked areas,or provide <br /> equivalence as allowed by CFR 11 2.7 a 2 <br /> Failed to design facility drainage system from undiked areas to Flow into appropriate ponds,lagoons,or <br /> 603 CFR 112.8(b)(3) catchment basins(in areas not subject to Flooding)designed to retain oil or return it to the facility,or <br /> rovide a uivalence as allowed by CFR 112.7(a)(2) <br /> Failed to equip the final discharge of all ditches with a diversion system that would retain oil in the <br /> 604 CFR 112.8(b)(4) facility in the event of an uncontrolled discharge if CFR112.8(b)(3)is not met,or provide equivalence as <br /> allowed by CFR 11 2.7 a 2 <br /> Inspector Receives By Title: <br /> Garrett Backus (209) 468-2986 a,r&-G <br /> EHO 28-02 Rev 04/19/12 Page APSA INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.