My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
4863
>
2800 - Aboveground Petroleum Storage Program
>
PR0538368
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:51:33 PM
Creation date
8/24/2018 7:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538368
PE
2831
FACILITY_ID
FA0005712
FACILITY_NAME
SGS Stockton - Carpenter Road
STREET_NUMBER
4863
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
Stockton
Zip
95215
APN
17905010
CURRENT_STATUS
01
SITE_LOCATION
4863 CARPENTER RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\4863\PR0538368\COMPLIANCE INFO 2016-PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016-PRESENT
QuestysRecordDate
3/2/2016 6:40:42 PM
QuestysRecordID
3020961
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
filled out , and placed on the proper containers . Photos are attached . Status <br /> COMPLETE , <br /> There were 8 violations listed on the aboveground petroleum storage report . Three of <br /> the violations on the report have been completed : <br /> 0 613 — Failed to conduct inspections or maintain records for 3 years : This <br /> violation resulted from how the facility inspector dated his reports . He has been <br /> conducting the monthly inspections , and has been coached on the proper way to <br /> document the inspection . A copy of the March inspection is attached . Status <br /> COMPLETE , <br /> 616 — Failed to schedule and conduct discharge prevention briefings at least <br /> annually : A safety meeting was held on March 16 , 2016 , to conduct a briefing on <br /> the facility SPCC plan with employees . A copy of the safety meeting roster is <br /> attached . Status COMPLETE . <br /> 0 716 — Failed to provide each container with a high level monitoring device : This <br /> is the same as violation #303 above . A level gauge has been purchased for the <br /> used oil tank . Status COMPLETE . <br /> For the remaining violations , we have hired HDR Inc. to prepare a revised SPCC plan <br /> that will address all issues noted during the inspection . Their environmental engineer, <br /> Michael Ernst , PE , CPSWQ , QSD , visited the site on March 16 , 2016 , to begin the <br /> process . He was provided a copy of the current SPCC plan and a copy of your report . <br /> He has also been provided your contact information , and will call you if he needs any <br /> clarification concerning the violations . Status IN PROGRESS . <br /> If you have any questions , please call be at (208) 867-2627 or email me at <br /> john . pallen6i simplot . com . <br /> Sincerely, <br /> J . R . SIMPLOT COMPANY <br /> John J . Pallen , CHMM <br /> EHS Manager <br /> cc . S . Woods <br /> P . Simpson <br /> P . Derig <br /> B . Ackerman <br /> 4 v^ " aY L. v ' 1Y +6 b b L b L b b ..` S v` `. L �`- -•. b S b .b b b b .S Z d 3 b .G. .b b v L b i J. vs S v` b b S d <br /> b,�,����b` ^_�;�ss �^�b ��..a..�..1. �. � .`. b � SA��.1.�ijiyi. i�i�.iya�ii�.,.�yiyiyi�.bpi.��.Abnb�nsn,`'�•,+�`��a��.�♦.p'h'i. A 'i.�'i.�A.a� <br />
The URL can be used to link to this page
Your browser does not support the video tag.