Laserfiche WebLink
San Joaquin County Fire Prevention Bureau <br />1810 E. Hazelton Ave., Stockton, CA 95205 <br />(209) 468-3121 rax; (209) 468-3163 <br />ABOVEGROUND TANK CLOSURE/REMOVAL PLAN <br />TFOI (801 DIM) <br />General Information <br />1. Name of Business: Lawrence Livermore National Lab, Site 300 Experimental Test Site <br />Site Address: 15999 W. Corral Hollow Rd. <br />Tank Owner/Operator Contact Person: John Scott (Site Manager) Phone: (925) 423-5026 <br />EPA ID #: CA2890090002 <br />2. Property Owner: Department of Energy <br />Owner Address: 7000 East Ave. Livermore. CA 94550 <br />3. Tank Removal Contractor: <br />Address: <br />Phone: <br />4. Required attachments: <br />® Plot Plan <br />TANK INFORMATION <br />5. Tanks to be closed: <br />Not Applicable <br />License Type: Not Applicable ID N: Not Applicable <br />©Analytical Results R801DIAl Tank Photo <br />6. Length of underground piping being closed under this plan: No underground piping in this closure <br />plan. <br />7. Have tanks or pipes leaked in the past. and/or has there been spillage during tilling or dispensing <br />activities? <br />❑ Yes. Describe: <br />❑ No <br />® Unknown <br />11ana(,wentent of Tanks (Not :applicable) <br />Before tanks are pumped out and inerted, all associated piping must be flushed out into the tanks. All <br />accessible associated piping must then be removed. Piping must be disposed of as hazardous waste unless <br />approved alternative method used. Inaccessible piping must be permanently plugged. It is the contractor's <br />responsibility to bring a working combustible gas indicator on site to verify that the tank is inert. Tanks <br />cannot be moved unless the LEL is < 20% and the O_, is <8 %. The meter calibration must be confirmed <br />in the fire inspector's presence. <br />A. Tanks to be man.wed as NON' llazardnus Waste AND not reined: <br />P.,:_. t ot 2 AST Closure Plan <br />Tank Contents <br />Tank <br />Tank Size <br />(including both current and <br />Materials of <br />No. <br />(gallons) <br />former, if different) <br />construction <br />of Tank <br />1 <br />300 <br />Diesel Fuel (from Standby <br />Steel <br />—Age <br />25 years <br />Diesel Gen -set) <br />2 <br />6. Length of underground piping being closed under this plan: No underground piping in this closure <br />plan. <br />7. Have tanks or pipes leaked in the past. and/or has there been spillage during tilling or dispensing <br />activities? <br />❑ Yes. Describe: <br />❑ No <br />® Unknown <br />11ana(,wentent of Tanks (Not :applicable) <br />Before tanks are pumped out and inerted, all associated piping must be flushed out into the tanks. All <br />accessible associated piping must then be removed. Piping must be disposed of as hazardous waste unless <br />approved alternative method used. Inaccessible piping must be permanently plugged. It is the contractor's <br />responsibility to bring a working combustible gas indicator on site to verify that the tank is inert. Tanks <br />cannot be moved unless the LEL is < 20% and the O_, is <8 %. The meter calibration must be confirmed <br />in the fire inspector's presence. <br />A. Tanks to be man.wed as NON' llazardnus Waste AND not reined: <br />P.,:_. t ot 2 AST Closure Plan <br />