My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37400
>
2800 - Aboveground Petroleum Storage Program
>
PR0540729
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 8:48:07 AM
Creation date
8/30/2018 11:06:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540729
PE
2832
FACILITY_ID
FA0019934
STREET_NUMBER
37400
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95307
APN
26512006
CURRENT_STATUS
01
SITE_LOCATION
37400 S BIRD RD
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix D Table : Vernalis Asphalt Facility Oil Storage Inventory; Potential Spill Scenarios; Containment Measures; Tank Integrity Program <br /> Potential Spill Potential Spill Potential Spill <br /> Tank Location Scenario Scenario Scenario <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ground slope inside <br /> Loop readily available . (Section 6 . 1, Appendix <br /> System containment H <br /> Ref: 40 CFR 112 . 8 ( c) ( 6 ) <br /> • AST <br /> • 1, 000 Full failure assumes Tank is filled by trained <br /> Gallons Overflow; 7-10 GPM , personnel ; tank <br /> AC Oil - • Vertical Fitting Leak; Sized concrete accessories and Asphalt oil is not a liquid <br /> AST-5 Calibration • Single- Rupture (worst Flow following secondary containment area are at 60° F; therefore, tank <br /> Tank Walled case scenario ) ground slope inside containment. formally inspection is not APSA-regulated . <br /> • Steel containment weekly; spill kits are <br /> readily available <br /> • Insulated <br /> • AST Compacted <br /> • 4, 000 N/A; Empty. Pump <br /> and hoses are local soil and <br /> Empty; Gallons Overflow; active <br /> AST-6 disconnected . Tank is filled by trained Details of testing : Not <br /> Previously • Horizontal Fitting Leak; containment <br /> Temporarily personnel ; spill kits are required for portable <br /> Contained • Single- Rupture (worst using <br /> Closed Diesel Walled case scenario ) Flow following equipment readily accessible . containers . <br /> ground slope in <br /> • Steel adjacent area . and <br /> • Portable absorbents . <br />
The URL can be used to link to this page
Your browser does not support the video tag.