Laserfiche WebLink
Appendix D Table : Vernalis Asphalt Facility Oil Storage Inventory; Potential Spill Scenarios; Containment Measures; Tank Integrity Program <br /> Potential Spill Potential Spill Potential Spill <br /> Tank Location Scenario Scenario Scenario <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ground slope inside <br /> Loop readily available . (Section 6 . 1, Appendix <br /> System containment H <br /> Ref: 40 CFR 112 . 8 ( c) ( 6 ) <br /> • AST <br /> • 1, 000 Full failure assumes Tank is filled by trained <br /> Gallons Overflow; 7-10 GPM , personnel ; tank <br /> AC Oil - • Vertical Fitting Leak; Sized concrete accessories and Asphalt oil is not a liquid <br /> AST-5 Calibration • Single- Rupture (worst Flow following secondary containment area are at 60° F; therefore, tank <br /> Tank Walled case scenario ) ground slope inside containment. formally inspection is not APSA-regulated . <br /> • Steel containment weekly; spill kits are <br /> readily available <br /> • Insulated <br /> • AST Compacted <br /> • 4, 000 N/A; Empty. Pump <br /> and hoses are local soil and <br /> Empty; Gallons Overflow; active <br /> AST-6 disconnected . Tank is filled by trained Details of testing : Not <br /> Previously • Horizontal Fitting Leak; containment <br /> Temporarily personnel ; spill kits are required for portable <br /> Contained • Single- Rupture (worst using <br /> Closed Diesel Walled case scenario ) Flow following equipment readily accessible . containers . <br /> ground slope in <br /> • Steel adjacent area . and <br /> • Portable absorbents . <br />