Laserfiche WebLink
Appendix D Table : Vernalis Asphalt Facility Oil Storage Inventory; Potential Spill Scenarios; Containment Measures; Tank Integrity Program <br /> Potential Spill Potential Spill Potential Spill <br /> Tank Location Scenario Scenario Scenario <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Oil ground slope in equipment <br /> vicinity of spill . and <br /> absorbents. <br /> Compacted <br /> Full failure assumes local soil and <br /> • 209 Gallon 10 GPM . active <br /> Transformer containment Spill kits are readily Not required at this <br /> MCC4 Oil • Operational Rupture Flow following using accessible . time . <br /> Oil ground slope in equipment <br /> vicinity of spill . and <br /> absorbents. <br /> Compacted <br /> Full failure assumes local soil and <br /> • 209 Gallon 10 GPM . active <br /> Transformer containment Spill kits are readily Not required at this <br /> MCC4 Oil • Operational Rupture Flow following using accessible . time . <br /> Oil ground slope in equipment <br /> vicinity of spill . and <br /> absorbents. <br />