Laserfiche WebLink
NOT APPLICABLE <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br />b. Identify contractor performing decontamination: <br />Name Phone (_ <br />Address City <br />c. Describe method to be used for decontamination: <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name Phone ( ) Hauler Reg# <br />Address City <br />Permitted Disposal Site <br />6. a. Describe the method that will be utilized to purge and/or inert the piping.- <br />b. <br />iping: <br />Zip <br />Zip <br />b. Piping Hauler: <br />Name Phone ( ) <br />Address City Zip <br />Hauler Registration # (if hauled as hazardous) <br />c. Piping Disposal Site: <br />Name Phone (_) <br />Address City Zip <br />EPA ID# (if transported to a permitted TSD facility) NOT APPLICABLE <br />7. Is the sampling firm an independent third party from the contractor? YES [ ] NO [ ] <br />a. Identify sampling firm: <br />Name Phone(_) <br />Address City Zip <br />b. Identify laboratory performing analysis: <br />Name Phone ( ) <br />Address City Zip <br />8. Describe, in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be obtained: <br />9. a. Handling of excavated soil (Contaminated Soil Hazardous Waste Hauler).- <br />Name <br />auler):Name TO BE DETERMINED AFTER TESTING Hauler Registration # <br />Address City <br />b. If soil is not to be hauled, describe what will be done with it: <br />4 <br />Phone ( ) <br />Zip <br />